The project involves the stabilization of approximately 10,000 square feet of slope by installing a High-Performance Turf Reinforcement Mat (HPTRM), anchored into the slope. The project requires the removal of residential items within the work area, excavation, and embankments. The project also includes mobilization, demolition, and construction of a stabilized construction entrance. The contractor will be responsible for hauling off and disposing of spoils, installing the HPTRM system, and providing seed and hay mulch for the area.
Some key features of the project include:
• Installation of HPTRM system
• Excavation and embankments
• Mobilization and demobilization
• Construction of a stabilized construction entrance
• Hauling off and disposing of spoils
• Seeding and mulching the area
The project is located in Windsor, Vermont, and the bid deadline is 7/24/2026 5:00 PM.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.