This solicitation seeks a qualified contractor to dismantle, remove, and dispose of two ship‑to‑shore gantry cranes (Crane A and Crane B) located at the Paul W. Conley Container Terminal in South Boston, Massachusetts. The work includes full crane disassembly, voyage‑bracing, transfer to marine transport vessels, sea‑fastening, and final disposal, all while complying with Massport safety, environmental, and FAA airspace requirements. The contractor must provide a 5 % bid bond, performance and payment bonds, and meet insurance, prevailing‑wage, and civil‑rights obligations. The project is budgeted at approximately $5 million and must be completed within 268 calendar days after the Notice to Proceed.
• Remove and fully dismantle both cranes, including all associated rigging, hydraulic, and electrical systems.
• Perform asbestos abatement for any identified materials (included in the bid) and handle any newly discovered asbestos via change orders.
• Coordinate with Massport’s pre‑bid conference, obtain TWIC credentials for all site personnel, and adhere to strict noise, traffic, and air‑space constraints.
• Provide required bid, performance, and labor bonds (5 % of bid) and maintain minimum insurance coverages ($1 M GL, $1 M Auto).