The Fair Oaks Boulevard Bicycle & Pedestrian Mobility Project - Phase 2 includes furnishing all necessary labor, materials, equipment, and other incidental and appurtenant work to satisfactorily complete the project. The work includes clearing and grubbing, pavement grinding, pavement removal, tree removal, roadway excavation, aggregate base, asphalt pavement, pavement repair, pavement overlay, slurry seal, pavement delineation, construction of curb, gutter, and sidewalk, sidewalk curb ramps, landscaping and irrigation, installation of drainage facilities, two new traffic signals and three traffic signal modifications, roadway signage, and all other work specified on the plans and in the Special Provisions.
Some key features of the project include:
• Clearing and grubbing
• Pavement grinding and removal
• Tree removal
• Roadway excavation and construction
• Installation of drainage facilities and traffic signals
• Landscaping and irrigation
• Construction of curb, gutter, and sidewalk
The project requires a valid California contractor's license with the classification of General Engineering Contractor, Class A. The estimated construction cost is $10,200,000.00.