Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Delaware guideDelaware Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Delaware
  4. ›Construction
  5. ›SR 1 MEDIAN BARRIER, SR 30 TO SR 16

State of Delaware DOT·Delaware

SR 1 MEDIAN BARRIER, SR 30 TO SR 16

Closes 7/14/2026$1.2M – $3MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Delaware Department of Transportation is seeking a qualified contractor to install a high‑tension cable median barrier along approximately 8.7 mi of State Route 1 between SR 30 and SR 16 in Sussex County. The work includes barrier installation, median crossover modifications, removal and replacement of pavement, drainage work, and all associated erosion‑control, utility coordination, and traffic‑control services. The contract is funded with Federal‑aid (ESTP‑2025(13)) and requires compliance with Buy‑America, Davis‑Bacon prevailing‑wage, and environmental regulations. • Install ~8.7 mi of high‑tension cable barrier (type 3‑31 guardrail) with required end‑terminals and maintenance strips. • Perform related roadway work: pervious asphalt paving, curb/sidewalk installation, drainage structures, utility relocation, and erosion‑control measures. • Provide traffic‑control supervision, ATSSA‑certified traffic supervisor, and meet all federal‑aid requirements (Buy‑America, prevailing‑wage, cargo‑preference, NPDES storm‑water compliance). • Deliver complete construction documentation, survey data, mix‑designs, and electronic ticketing for material deliveries. • Project duration is 316 calendar days after notice to proceed, with an expected start around early September 2026.

Attached files

Contact

Kimberly Smith(Contract Administration)

dot‑[email protected]

(302) 760-2031

Key dates

Opened
6/8/2026
Closes
7/14/2026
Duration
316 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
T202500901

Budget estimate

$1,200,000 – $3,000,000

No contract value is disclosed, but similar median‑barrier installations on a multi‑mile highway typically range from $1 million to $3 million, depending on material costs, labor rates (prevailing‑wage), and additional drainage and utility work. Assuming an average cost of $1,500‑$2,500 per linear foot for high‑tension cable barrier plus ancillary work, the total award is estimated between $1.2 M and $3 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Southeastern Pennsylvania Transportation Authority·Pennsylvania

Top match · 60%

Concrete Jersey Barriers-Queen Lane RRD

Rolling / TBD closeOpened 9/2/2026

City of North Augusta·South Carolina

60% match

US 25 (Georgia Avenue) Traffic Calming

Closes 11/12/2026Opened 10/26/2026

Virginia Department of Transportation·Virginia

60% match

B36_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

California Department of Transportation·California

60% match

SB Minor B-Install passageway for emergency vehicles-San Diego County

Closes 11/12/2026Opened 10/29/2026

City of Sacramento·California

60% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

Georgia City of Monroe·Georgia

60% match

SR 11 at US 78 East Bound Ramp Intersection Improvements - KW Project No. 240294

Closes 11/19/2026Opened 10/21/2026

California Department of Transportation·California

60% match

RHMA, HMA, and concrete barrier.

Closes 11/3/2026Opened 9/14/2026

Loudoun County·Virginia

59% match

Route 15 North Widening: Battlefield Parkway to Montresor Road, IFB NG00004

Closes 11/20/2026Opened 10/13/2026

California Department of Transportation·California

59% match

ADA curb ramps, high tension cable barrier, and LED lighting.

Closes 11/5/2026Opened 9/21/2026

City of Richmond Government·Virginia

59% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

59% match

16--BARRIER,STOWAGE

Closes 11/11/2026Opened 10/27/2026

California Department of Transportation·California

59% match

SB Minor B - Guardrail Replacement - San Diego County

Closes 11/6/2026Opened 10/23/2026

Georgia City of Sandy Springs·Georgia

59% match

Dunwoody Road Gap Fill Sidewalk T6026-2

Closes 11/13/2026Opened 10/13/2026

The Village of Royal Palm Beach·Florida

59% match

SR80 Irrigation Boring

Closes 11/13/2026Opened 10/30/2026

State of Delaware DOT·Delaware

59% match

OPEN END- PATCHING AND THIN OVERLAY, CENTRAL DISTRICT, FY 26 - 29

Closes 11/10/2026Opened 10/13/2026

Massachusetts Department of Transportation·Massachusetts

59% match

616377 DISTRICT 1 Scheduled and Emergency Guardrail and Fence Repairs at Various Locations on I-90

Closes 11/3/2026Opened 10/13/2026

County of Loudoun·Virginia

59% match

IFB NG00004: Route 15 North Widening: Battlefield Parkway to Montresor Road

Closes 11/20/2026Opened 10/13/2026

California Department of Transportation·California

58% match

IFB Guardrail Services, Imperial and San Diego Counties.

Closes 11/3/2026Opened 10/19/2026

Texas Department of Transportation·Texas

58% match

LOCAL LET MAINTENANCE CONTRACT, NAVARRO CO, REPAIR/REPLACE CONCRETE BARRIER

Closes 11/12/2026Opened 10/21/2026

California Department of Transportation·California

58% match

Thermoplastic traffic stripe, partially grouted RSP, Rdwy Exc, & HMA.

Closes 12/8/2026Opened 10/26/2026

Illinois Tollway·Illinois

58% match

I-26-2064 - Asphalt Overlay & Pavement Marking

Closes 11/13/2026Opened 10/3/2026

City of Bartow, FL·Florida

58% match

Main Street Concrete Curbing, Sidewalk, and Driveways.

Closes 11/25/2026Opened 10/20/2026

Town of South Hill·Virginia

58% match

IFB FY27-01: Asphalt Overlay & Traffic Marking

Closes 11/18/2026Opened 10/21/2026

Florida State University·Florida

58% match

Grounds Maintenance & Landscape Services for University Medians

Closes 11/12/2026Opened 10/12/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

58% match

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026