The City of Davenport is seeking a qualified contractor to execute the Union Station Flood Repairs Project, which includes constructing an earthen berm with sheet‑pile wall, a freestanding flood wall, a removable flood gate, PCC paving, a new storm‑sewer system, topsoil, sodding, landscaping, and comprehensive erosion‑control measures. The contractor must provide all labor, materials, equipment, and manage utility coordination, traffic control, permitting, and site restoration within a tight 45‑day construction window (excluding the winter shutdown period). The contract value is estimated at approximately $1.12 million, with a 5 % bid bond required for bids over $100 k and monthly progress payments subject to a 3 % retainage.
• Scope: earthwork (berm, sheet‑pile, flood wall), flood gate installation, concrete paving, storm‑sewer installation, landscaping, erosion control.
• Location: 102 S Harrison Street, Davenport, IA.
• Schedule: Notice to Proceed ~ Nov 2 2026; 45 calendar days to complete (winter shutdown excluded).
• Bonds: 5 % bid bond for projects > $100 k.
• Payments: Monthly progress payments with 3 % retainage; liquidated damages $500/day.
• Requirements: No prevailing wage, no specific bid bond form, compliance with City inspections, traffic control, utility coordination, and public notification.