Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›SB008-27 Lawrenceville Pedestrian Improvements

Georgia City of Lawrenceville·Georgia

SB008-27 Lawrenceville Pedestrian Improvements

Closes 9/17/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Lawrenceville is soliciting competitive sealed bids from Contractors for the Lawrenceville Pedestrian Improvements 2026 project. The project includes various improvements such as traffic control, erosion control, site work, concrete paving, thermoplastic striping, and handrail installation. The work will be performed at multiple locations throughout the city, including sidewalks, driveways, and intersections. The contractor will be required to comply with all federal, state, and local requirements and specifications. A pre-bid conference is scheduled for August 25, 2026, and all bidders are urged to attend. Some key features of the project include: • Traffic control for both vehicular and pedestrians following the latest MUTCD and GDOT standards • Erosion control BMPs including mulch, temporary grassing, silt fence, and sodding • Site work including clearing & grubbing, remove and replace existing signs, grading and excavation • Concrete paving including construct concrete curb & gutter, construct 4” thick sidewalk, 8” thick driveway, and ADA ramps • Thermoplastic striping and 42” handrail installation The project requires the contractor to have experience with similar projects and to have the necessary equipment and personnel to complete the work within the specified timeframe.

Attached files

Contact

Kenneth Morris(Purchasing Director)

[email protected]

(678) 407-6585

Key dates

Opened
8/13/2026
Questions due
8/27/2026
Pre-bid meeting
8/25/2026
Closes
9/17/2026
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
SB008-27

Budget estimate

$500,000 – $2,000,000

Based on the project's scope, which includes traffic control, erosion control, site work, concrete paving, and other improvements at multiple locations, the estimated budget for this project could be between $500,000 and $2,000,000. This estimate takes into account the various components of the project, including labor, materials, and equipment costs. However, the actual budget may vary depending on the bids received and the final scope of work. Factors that may influence the budget include the number of bidders, the complexity of the work, and the availability of materials and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Virginia Department of Transportation·Virginia

Top match · 73%

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Virginia Department of Transportation·Virginia

71% match

B36_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

NYS East Fishkill, Town of·New York

71% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Richmond Government·Virginia

71% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

North Carolina Town of Knightdale·North Carolina

70% match

Old Knight Road Sidewalk Improvement Project

Closes 11/3/2026Opened 9/18/2026

Town of Westwood·Massachusetts

70% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

City of Lawrence·Kansas

69% match

MS-220015A Lawrence Pump Station 9 Improvements

Closes 12/8/2026Opened 10/27/2026

City of Lawrence·Kansas

68% match

MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project

Closes 11/10/2026Opened 9/11/2026

Virginia Department of Transportation·Virginia

68% match

B38_2027 SMART SCALE - ROADWAY AND PEDESTRIAN IMPROVEMENTS

Closes 12/15/2026Opened 10/27/2026

Charleston County·South Carolina

68% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

Division of Highways·North Carolina

68% match

North Carolina Department of Transportation – Contract DJ00608 (Pedestrian Improvements – Union County)

Closes 11/4/2026Opened 10/14/2026

City of Long Beach·California

68% match

R-7298 1st Street Pedestrian Improvements

Closes 11/10/2026Opened 10/7/2026

Virginia Department of Transportation·Virginia

68% match

B13_2027 PEDESTRIAN AND ROAD IMPROVEMENTS

Closes 11/18/2026Opened 10/27/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

68% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

City of Hampton·Virginia

68% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of Ontario·California

67% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

Virginia Department of Transportation·Virginia

67% match

B24_2027 SMART SCALE - BIKE AND PEDESTRIAN IMPROVEMENTS

Closes 11/18/2026Opened 10/14/2026

City of Richmond·Virginia

67% match

US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/2/2026Opened 10/23/2026

City of Fort Wayne·Indiana

67% match

0890C - Eckart St Reconstruction: S Anthony Blvd to Winter St

Closes 11/12/2026Opened 10/29/2026

Missouri Department of Transportation·Missouri

67% match

KC District, City of Smithville, construction of a single lane roundabout at the intersection of Bridge Street

Closes 11/3/2026Opened 9/30/2026

LA Public Works Engineering Bureau·California

66% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

Town of Bluffton·South Carolina

66% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Maryland Carroll County Government - Procurement·Maryland

66% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

Ohio City of Westerville·Ohio

66% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

City of Smithville·Missouri

66% match

RFP 26-07 Bridge Street Roundabout Improvements

Closes 11/3/2026Opened 9/29/2026