Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Civil Engineering
  5. ›Palmerston North Detention Pond Retrofit – Civil…

Richland County·South Carolina

Palmerston North Detention Pond Retrofit – Civil Engineering Services

Closes 10/6/2026$150k – $300kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Richland County Public Works seeks a qualified civil engineering firm to produce comprehensive stormwater engineering plans and specifications for retrofitting an existing detention pond and its downstream outfall channel in the Palmerston North neighborhood. The design effort must balance cost‑effective construction with long‑term maintenance simplicity, restoring the facility to regulatory compliance. • Scope includes detailed design drawings, hydraulic calculations, permitting support, and construction‑ready specifications. • Work focuses on a single detention pond and associated channel, emphasizing minimal disruption to the surrounding community. • Deliverables are expected to enable a subsequent construction contract, with the engineering firm responsible for all design phases up to bid‑ready status.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Shirley Drayton

[email protected]

Key dates

Opened
9/4/2026
Closes
10/6/2026

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
RC-817-Q-26

Budget estimate

$150,000 – $300,000

Based on comparable municipal stormwater design contracts, a full design package for a detention pond retrofit typically ranges from $150 k to $300 k, depending on site complexity, required permitting, and level of detail. The lower end assumes a straightforward design with limited ancillary studies; the higher end includes extensive hydraulic modeling, community outreach, and full construction‑ready documentation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Casper·Wyoming

Top match · 74%

GLENDALE DETENTION POND IMPROVEMENTS

Closes 11/6/2026Opened 10/17/2026

S7 KTR, LLC on behalf of Montgomery County Municipal Utility District No. 201·Texas

74% match

Detention Ponds and Mass Grading to Serve Longleaf Development

Closes 11/12/2026Opened 10/23/2026

Virginia Polytechnic Institute and State University·Virginia

72% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

North Carolina City of Raleigh·North Carolina

72% match

Camp Pond Dam Reconstruction Project

Closes 11/5/2026Opened 9/22/2026

City of North Charleston·South Carolina

72% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

City of North Charleston·South Carolina

72% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

Virginia Polytechnic Institute and State University·Virginia

71% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

City of Victoria·Minnesota

71% match

2027 Pond Maintenance Project

Closes 11/19/2026Opened 10/30/2026

City of Charlotte·North Carolina

71% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Casper·Wyoming

71% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

City of Charlotte·North Carolina

71% match

Robert L. Smith Park Pond Surface Water Quality Improvement Project

Rolling / TBD closeOpened 5/29/2026

New York City Department of Environmental Protection·New York

70% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of Prior Lake·Minnesota

69% match

2026-2027 Pond Maintenance Project

Closes 11/19/2026Opened 10/30/2026

New York City Department of Environmental Protection·New York

69% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Massachusetts City of Newburyport·Massachusetts

69% match

IFB No. 27-07 Bartlet Mall Restoration Project

Closes 12/17/2026Opened 10/28/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

68% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026

Colton Municipal Utility District No. 1·Texas

68% match

Mass Grading and Detention Facilities to Serve Colton Detention Pond A Phase 1

Closes 11/10/2026Opened 10/20/2026