The US Air Force is seeking proposals for the replacement of a vault and fuel tank at Tinker Air Force Base in Oklahoma. The project involves furnishing all design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the installation of a new above-ground diesel tank inside B3202. The project magnitude is estimated to be between $1,000,000 and $5,000,000. The successful contractor will be required to manage and maintain the construction site, ensure compliance with all applicable codes and standards, and provide a comprehensive load calculation, circuit coordination, and arc flash analysis prior to demolition.
• The project requires a design-build approach, with the contractor responsible for designing and building the new fuel tank and associated systems.
• The contractor must ensure that all work is performed in accordance with applicable codes and standards, including NFPA 20, 30, and 31.
• The contractor must provide a comprehensive load calculation, circuit coordination, and arc flash analysis prior to demolition.
• The contractor must ensure that all systems are fully functional and meet the requirements of the applicable codes and standards.
• The contractor must provide a warranty for the work performed, with a duration of 30 years.