Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Engineering Services
  5. ›TOS No. 113 - Sepulveda Boulevard Tunnel Near Mulholland…

LA Public Works Engineering Bureau·California

TOS No. 113 - Sepulveda Boulevard Tunnel Near Mulholland Drive Phase 1 Project

Closes 11/21/2025$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Los Angeles is seeking a consulting firm to provide design services for emergency structural repairs at the Sepulveda Boulevard Tunnel. The selected Consultant will prepare plans, specifications, and estimates (PS&E) for the emergency repair, provide technical support during the bid and award phase, and offer design support during construction. The Consultant will also develop a permanent drainage mitigation plan. The project involves removing unsound concrete, patching with structural repair mortar, replacing tiles, and addressing drainage issues. The City encourages the use of alternate materials and methods where beneficial. The Consultant must work closely with the Bureau of Engineering, the Los Angeles Department of Transportation, and the Bureau of Street Services. • The project requires the preparation of 75% and 100% construction documents, including PS&E. • The Consultant must deliver a site investigation report to validate existing conditions. • The Consultant must provide monthly progress reporting and invoicing. • The Consultant must prepare a Quality Assurance/Quality Control plan. • The Consultant must conduct a structural observation of formwork, rebar, and other construction. • The Consultant must prepare record drawings for the construction of the project.

Attached files

Contact

Kevin Avila(Project Manager)

[email protected]

Key dates

Opened
10/3/2025
Questions due
10/17/2025
Closes
11/21/2025
Duration
26 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
TOS No. 113

Budget estimate

$500,000 – $2,000,000

Based on the scope of work, which includes design services, construction support, and a permanent drainage mitigation plan, the estimated budget could range from $500,000 to $2,000,000. This estimate considers the complexity of the project, the need for specialized engineering services, and the potential duration of the project (approximately 26 months). Factors influencing this estimate include the cost of labor, materials, and equipment, as well as any potential change orders or unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Los Angeles County Public Works·California

Top match · 72%

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

California Department of Transportation·California

71% match

SB Minor B-Install passageway for emergency vehicles-San Diego County

Closes 11/12/2026Opened 10/29/2026

City of Pasadena·California

69% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

LA Public Works Engineering Bureau·California

69% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

San Bernardino County·California

69% match

Muscoy Area Rehabilitation - Phase 1

Closes 12/3/2026Opened 10/27/2026

County of Los Angeles Department of Public Works·California

68% match

RMD1402001 - Hacienda Heights - Hacienda Boulevard Phase I

Closes 11/17/2026Opened 10/20/2026

Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division·Massachusetts

68% match

Massachusetts Bay Transportation Authority Design‑Build Request for Proposals – Red Line Hi‑Rail Access Tunnel (Contract No. Y42CN01)

Closes 12/10/2026Opened 7/15/2026

The City of Anaheim·California

68% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

City of Cincinnati·Ohio

68% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Cedar Rapids·Iowa

68% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

New York City Department of Environmental Protection·New York

68% match

Bid Extension: 82626B0055-BEDC-C547B: SHAFT EQUPMENT INSTALLATION & RETROFIT TUNNEL ACTIVATION

Closes 12/22/2026Opened 7/13/2026

City of Shawnee·Kansas

68% match

Resolution No. 2061

Closes 8/6/2030Opened 5/6/2025

City of Shawnee·Kansas

68% match

Ordinance No. 3480

Closes 1/16/2029Opened 1/16/2024

Louisiana Jefferson Parish Purchasing Department·Louisiana

68% match

Ames Blvd. Lighting: From Lapalco Blvd. to Barataria Blvd

Closes 12/3/2026Opened 10/14/2026

City of Austin·Texas

68% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

County of San Luis Obispo·California

68% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

City of Shawnee·Kansas

68% match

Resolution No. 2056

Closes 4/22/2030Opened 4/22/2025

City of Napa·California

68% match

Citywide Striping - Phase 3

Closes 11/16/2026Opened 10/27/2026

New York City Department of Sanitation·New York

67% match

82726B0005-Bronx Community Districts 9, 10 & 11 Garage Demolition and Replacement, 800 Zerega Avenue, Bronx, NY 10473 and South Lot Swing Space, 530 Zerega Avenue, Bronx, NY 10473

Closes 3/4/2027Opened 7/20/2026

City of Maryville·Missouri

67% match

South Main Trail Connection Project - Maryville, MO

Closes 11/10/2026Opened 10/8/2026

City of Columbus Ohio·Ohio

67% match

Central College Subtrunk – Phase 3

Closes 11/18/2026Opened 9/8/2026

City of Charlotte·North Carolina

67% match

McCullough Drive Extension

Rolling / TBD closeOpened 1/1/2026

New York City Department of Design and Construction·New York

67% match

85026B0091 - HWX405 - SOUTHERN BOULEVARD BICYCLE AND PEDESTRIAN SAFETY IMPROVEMENTS, THE BRONX

Closes 11/5/2026Opened 5/4/2026

West County Wastewater·California

67% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

County of Okaloosa·Florida

67% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026