The Massachusetts Department of Transportation is seeking bids for the replacement of a bridge on Church Street over Keyup Brook. The project involves the removal of the existing bridge and the installation of a new precast concrete three-sided rigid frame structure. The project also includes the widening of the roadway to accommodate two 10-foot lanes, two 4-foot shoulders, and a 5-foot sidewalk. The successful bidder will be responsible for completing the project within the specified timeline and budget. Key aspects of the project include:
* Replacement of the existing bridge with a new precast concrete structure
* Widening of the roadway to accommodate two 10-foot lanes, two 4-foot shoulders, and a 5-foot sidewalk
* Removal of the existing bridge and installation of new precast footings and a three-sided frame
* Full depth roadway replacement up to 73 feet south of the bridge and 32 feet north of the bridge
* Overhead utility relocation and tree trimming
* Bridge closure and replacement timeline
The project requires the implementation of avoidance and minimization measures to protect the endangered Indiana bat and northern long-eared bat.
* Ensure all operators, employees, and contractors working in areas of known or presumed bat habitat are aware of all FHWA/FRA/FTA environmental commitments, including applicable avoidance and minimization measures.