This opportunity involves the design, supply, installation, and commissioning of elevated water storage tanks and associated water‑hammer hazard mitigation systems for the Sewage and Water Board of New Orleans. The scope covers demolition of existing infrastructure, extensive civil works (pavement, curbs, landscaping), steel‑buried piping, a large inventory of high‑capacity valves and actuators, recirculation pumps, electrical and instrumentation systems, fencing, lighting, and site‑safety measures. Multiple vendors submitted detailed line‑item bids, indicating a highly complex, multi‑disciplinary construction project.
• Design, fabrication, and installation of two elevated storage tanks (Panama and Claiborne) with associated piping, pumps, and controls.
• Comprehensive civil and structural works including demolition, parking‑lot restoration, curbing, paving, fencing, and lighting.
• Procurement and installation of a wide range of high‑pressure valves, gate valves, butterfly valves, and recirculation pumps, plus steel buried pipe and support systems.
• Electrical, instrumentation, and control system integration for tank operation and water‑hammer mitigation.
• Project valued at > $30 million, with numerous lump‑sum and unit‑price line items across multiple trades.