Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›Replacement of Bridge 9 on MKT Trail

City of Columbia·Missouri

Replacement of Bridge 9 on MKT Trail

Closes 10/20/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Columbia, Missouri is seeking a qualified contractor to design, fabricate, deliver, and install a new 105‑foot single‑span prefabricated truss pedestrian bridge (Bridge 9) on the MKT Trail over Flat Branch Creek. The contractor must have at least five years’ experience with similar bridge structures, provide all required materials, utilities, and labor, and be listed on the Missouri Department of Transportation Qualified Contractor List. Work must commence after a Notice to Proceed and be completed within 180 calendar days. The contract includes performance and labor‑and‑material bonds equal to 100 % of the contract price, compliance with prevailing‑wage requirements, OSHA safety training, and full site cleanup. Bids are due October 20, 2026, with a pre‑bid conference/site walk on October 9, 2026. • 105‑ft long, 11‑ft clear‑width, single‑span prefabricated truss pedestrian bridge • Must be installed on concrete abutments at 0° skew, 0% grade • Contractor responsible for all materials, temporary utilities, insurance, and site cleanup • Minimum 5 years experience with prefabricated truss bridges; must be on MoDOT Qualified Contractor List • Bonds: 5 % bid bond; 100 % performance and labor‑material bonds • Prevailing‑wage compliance (Missouri Wage Order 33) and OSHA 10‑hour safety program required • Project schedule: Notice to Proceed → 180 days to complete • Pre‑bid conference/site inspection: Oct 9, 2026, 10:00 AM (attendance encouraged, not mandatory) • Bid submission: sealed paper or electronic via e‑bidding portal, deadline Oct 20, 2026, 2:00 PM CST.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brittany Miller(Procurement Officer)

[email protected]

(573) 874-7687

Key dates

Opened
9/29/2026
Questions due
10/9/2026
Pre-bid meeting
10/9/2026
Closes
10/20/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
90/2026

Budget estimate

$500,000 – $1,500,000

No contract value is disclosed in the solicitation. Based on typical costs for a 105‑ft prefabricated truss pedestrian bridge—including design, fabrication, delivery, installation, temporary utilities, bonding, and cleanup—the total project cost in Missouri is likely between $0.5 million and $1.5 million. Factors influencing the final amount include material prices (steel, concrete), site access conditions, labor rates, and any unforeseen site remediation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Columbia·Missouri

Top match · 74%

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

Minnesota Department of Administration·Minnesota

70% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

66% match

RED TRAIL SLAB BRIDGE REPLACEMENT

Closes 11/2/2026Opened 10/9/2026

City of Keene·New Hampshire

65% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

Maryland Department Of General Services·Maryland

63% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

Massachusetts Department of Transportation·Massachusetts

63% match

612193 ANDOVER FAP No. HIP(NGB)-0934(003) Bridge Preservation, A-09-022, I-93 over Merrimack River

Closes 12/1/2026Opened 8/24/2026

U.S. Department Of Agriculture·California

63% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

City of Keene·New Hampshire

63% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

County of Marin·California

63% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

City of Ormond Beach - Purchasing Office·Florida

62% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

Cobb County·Georgia

62% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

U.S. Department Of Transportation·Washington

62% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

U.S. Department Of Transportation·Wyoming

62% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/28/2026

Howard County, Office of Procurement·Maryland

62% match

Patuxent Branch Trail Improvements

Closes 12/23/2026Opened 10/23/2026

U.S. Department Of Transportation·Washington

62% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/2/2026

Connecticut Town of Simsbury·Connecticut

62% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

City of Green Bay·Wisconsin

61% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Massachusetts Department of Transportation·Massachusetts

61% match

609068 SHEFFIELD FAP No. STP(BR-OFF)-003S(993)X Bridge Replacement, S-10-015, Kelsey Road over Sch

Closes 11/10/2026Opened 9/8/2026

U.S. Department Of Transportation·Washington

61% match

WY NP YELL 15(3), Madison River Bridge Interim Repair

Closes 5/2/2027Opened 5/2/2025

Daviess County·Missouri

61% match

Daviess County: Bridge Replacement - Bridge No. 3960007; BRO-R031 (002); Forest Avenue

Closes 11/18/2026Opened 10/16/2026

Kenosha County·Wisconsin

61% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Keene·New Hampshire

61% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Great Rivers Greenway·Missouri

60% match

GRG 2026-009-725I - Missouri Greenway: Monarch Chesterfield Levee Trail Signage Replacement Project

Closes 11/6/2026Opened 10/12/2026

Missouri Department of Transportation·Missouri

60% match

SE District, St, Francois County, King School Road Replacement

Closes 11/10/2026Opened 10/15/2026

City of St. Louis Board of Public Service·Missouri

60% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026