The Miami‑Dade County Fire Rescue is renovating Fire Station 53, requiring demolition, removal and replacement of storefronts, impact‑resistant windows, doors, garage overhead doors, interior kitchen cabinets, and heavy‑duty resinous flooring, plus associated mechanical, electrical, plumbing, and civil work. The work is split into an exterior phase (storefront, windows, doors, roll‑up doors) and an interior phase (kitchen, flooring, MEP upgrades). The contractor must provide all labor, materials, equipment, shop drawings, warranties, and comply with strict Miami‑Dade impact‑resistance and wind‑load standards, while maintaining daily site safety, debris removal, and limited work hours.
• Replace storefront, windows, doors, and garage roll‑up doors with Miami‑Dade‑approved impact‑resistant products (E‑Level or approved equal).
• Install new exterior swing doors, paint with DTM Sherwin‑Williams paint, and perform all related stucco, caulking, and wall repairs.
• Provide stainless‑steel kitchen cabinets with quartzite tops, and apply 2,000 sf of Elite Crete resinous flooring suitable for fire‑truck traffic.
• Execute full MEP modifications, including ductwork, electrical, plumbing, and gas, meeting NEC, FBC, and local codes; submit detailed shop drawings for approval.