The City of Cincinnati is seeking a contractor to fully demolish the elevated walkway that connects the Town Center Garage to the adjacent CET building, and to perform related site‑restoration work. The scope includes removal of the canopy, walkway, stairs, and supporting columns, relocation of the elevator/electrical room, conversion of curb area to on‑grade parking, and concrete repairs at the CET landings. The contractor must submit a fixed‑price bid, provide required performance and bid bonds, meet M/WBE participation goals, and comply with all safety, environmental, and prevailing‑wage requirements.
• Demolition of the entire elevated walkway, canopy, stairs, and associated structural elements.
• Installation of new railings and support columns, relocation of elevator/electrical room, and concrete repair work.
• Required compliance: performance bond (100 % of contract), bid bond (10 % of bid), M/WBE goals (≈10 % MBE, ≈12 % WBE), workers’ compensation, insurance, and OSHA/EPA standards.
• Bids due Oct 30 2025; substantial completion required by Feb 2026; liquidated damages $200 per day for delays.