The Town of Reading, Vermont is seeking a contractor to make energy improvements to the Fire Station, including ventilation, heat pumps, weatherization, lighting, and battery storage. The contractor will be responsible for furnishing and installing various energy-efficient systems, including a cold-climate Energy Recovery Ventilator (ERV), a Makeup Air Unit (MAU), air-to-air heat pumps, and LED lighting. The contractor must also ensure that all work is done in accordance with local, state, and federal regulations.
• The project includes the installation of a 10-ton heat pump system, a 1-ton heat pump system for the breakroom, and a 1-ton heat pump system for the mezzanine offices.
• The contractor must also install a new smart thermostat and integrate it with the existing boiler system.
• The project requires the removal and proper disposal of old equipment, as well as the coordination of work schedules with the town's representative.
• The contractor must provide a professional appearance and conduct while on-site, and maintain a clean and safe working environment.
• The project includes a mandatory site visit on January 22nd, 2026, at 11:00 AM.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.