The City of Lakeland is seeking a state of Florida registered contractor to provide all required materials, tools, permits, equipment, traffic control, labor, and supervision for the construction of the Hartsell Avenue Trail from Sikes Boulevard (SR 563) to Lake Beulah Drive. The project includes the construction of a 10-foot wide shared-use path, milling and resurfacing of the existing pavement, curb work, earthwork, base work, signing and marking, and lighting improvements. The contractor must be pre-qualified by the Florida Department of Transportation in the following workgroups: flexible paving, pavement marking, roadway signing, and sidewalk and other work classes.
Key aspects of the project include:
• Construction of a 10-foot wide shared-use path along the east side of Hartsell Avenue
• Milling and resurfacing of the existing pavement
• Curb work, earthwork, base work, signing and marking, and lighting improvements
• Upgrade of existing curb ramps within the trail alignment
• Construction of a new boarding and alighting area for a transit stop at the intersection of Sikes Boulevard (SR 563) and Hartsell Avenue
The contractor will be required to provide all necessary materials, tools, permits, equipment, traffic control, labor, and supervision for the project.