Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA…

U.S. Department Of Transportation·Washington

WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

Closes 1/15/2026$5M – $10MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves improvements and stabilization of Hawk Creek Road in Lincoln County, Washington. The work includes clearing and grubbing, removal of gates, headwalls, and signs, roadway excavation, and placement of riprap. The contractor shall commence work within 10 calendar days after receiving the notice to proceed and complete the entire work ready for use not later than 10/06/2026. The project has an estimated price range of $5,000,000 to $10,000,000. Some key features of the project include: * The project is a total small business set-aside. * The contractor shall provide adequate 2-way communication facilities to report a fire to the USFS within 15 minutes of detection. * The contractor shall furnish serviceable fire-fighting tools at each job site location. * The contractor shall provide a tank truck or trailer containing not less than 300 gallons of water during yarding, loading, land clearing, right of way clearing, and mechanical treatment of slash. The project requires the contractor to take all reasonable action to prevent and suppress fires in the project area and to comply with the fire prevention and suppression plan.

Attached files

Contact

[email protected]

(360) 619-7520

Key dates

Opened
9/3/2025
Closes
1/15/2026
Duration
496 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
69056725B000004

Budget estimate

$5,000,000 – $10,000,000

Based on the document, the estimated price range of the project is between $5,000,000 and $10,000,000. The budget estimation is likely to be around this range, considering the scope of work and the requirements of the project. The factors that may influence the likely payment range include the complexity of the work, the materials and equipment required, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Transportation·Idaho

Top match · 71%

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 9/14/2026

U.S. Department Of Transportation·Washington

69% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 8/12/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

68% match

PUBLIC NOTICE: 2024–2027 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) AMENDMENT NO. 6 APPROVED

Rolling / TBD closeOpened 9/22/2026

U.S. Department Of Transportation·Hawaii

67% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

U.S. Department Of Transportation·Wyoming

67% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

U.S. Department Of Transportation·Colorado

67% match

TX FW LGA 10(5) Steve Thompson Wildlife Drive

Closes 11/3/2026Opened 10/1/2026

Nevada Government·Nevada

67% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of Transportation·Washington

67% match

WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4

Closes 11/4/2026Opened 9/30/2026

Washington County, WI·Wisconsin

67% match

Glacier Hills Co Park Friess Lake Access Project

Closes 11/5/2026Opened 10/7/2026

City of San Diego·California

66% match

Front/Washington Signal Mod and Albatross/Washington HAWK

Closes 11/17/2026Opened 10/12/2026

U.S. Department Of Transportation·Washington

66% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

U.S. Department Of Transportation·Washington

66% match

WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing

Closes 7/22/2028Opened 7/22/2026

U.S. Department Of Transportation·Washington

66% match

MT FLAP SILVER 2021(1), Roosevelt Drive Safety and Realignment Project

Closes 7/27/2028Opened 7/27/2026

Georgia Wilcox County Board of Commissioners·Georgia

66% match

FY2026 LRA - Gordon Road & Thompson Road

Closes 11/5/2026Opened 10/7/2026

U.S. Department Of Transportation·Washington

66% match

WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4

Closes 11/13/2026Opened 9/30/2026

Lexington County·South Carolina

66% match

Roadway Improvements for Hass Lucas Road

Closes 11/20/2026Opened 10/16/2026

U.S. Department Of Transportation·Montana

66% match

MT FLAP SILVER 2021(1), Roosevelt Drive Safety and Realignment Project

Closes 7/27/2028Opened 7/27/2026

Idaho Transportation Department·Idaho

66% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

Municipality of Skagway·Alaska

66% match

West Creek Levee Improvements

Closes 11/9/2026Opened 10/12/2026

Washakie County Conservation District·Wyoming

65% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

65% match

DOT&PF Notice of Public Open House: Klondike Highway Rehabilitation: Skagway River Bridge to Black Lake

Rolling / TBD closeOpened 9/15/2026

City of Seattle·Washington

65% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Idaho Transportation Department·Idaho

65% match

Key No. 21860 US-91, PARK LAWN TO SIPHON ROAD, CHUBBUCK

Closes 11/10/2026Opened 9/25/2026

Clark County·Nevada

65% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

City of Seattle·Washington

65% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026