Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›Front/Washington Signal Mod and Albatross/Washington HAWK

City of San Diego·California

Front/Washington Signal Mod and Albatross/Washington HAWK

Closes 11/17/2026$1.1M – $1.4MInvitation for Bid
Get bids like this by emailBid source

Description

The City of San Diego is seeking qualified contractors to modify the Front‑Washington traffic signal and install an Albatross‑Washington HAWK pedestrian‑activated beacon. The work includes removal of existing poles, installation of new traffic‑signal poles, conduit, fiber‑optic cabling, LED signal heads, vehicle detectors, pedestrian push‑buttons, curb‑ramps, and associated controller upgrades. The project also requires compliance with state prevailing‑wage laws, a mandatory Project Labor Agreement, and specific Small/Labor‑Based Enterprise participation goals. • Replace eight‑inch signal heads with 12‑inch LED heads and upgrade streetlights to LED. • Install two HAWK beacon poles with pedestrian barricades, new streetlight, and improved striping. • Minimum 50 % self‑performance, 6.5 % SLBE/ELBE subcontract participation, and 30 % local‑worker craft‑hour goal. • Bid bond of 10 % required, award value estimated at $1.26 million, contract duration 328 working days.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Abel Martinez(Contract Specialist)

[email protected]

(619) 533-5270

Key dates

Opened
10/12/2026
Pre-bid meeting
10/20/2026Mandatory
Closes
11/17/2026
Duration
328 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
K-27-2466-DBB-3

Budget estimate

$1,100,000 – $1,400,000

The solicitation lists an estimated construction cost of $1,260,000. Considering typical bid‑price adjustments, contingency, and potential subcontractor fees, the contractor’s net earnings are likely to fall within a range of roughly $1.1 million to $1.4 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Redlands·California

Top match · 83%

Traffic Signal Head Improvements

Closes 11/16/2026Opened 10/22/2026

City of San Diego·California

83% match

Gompers Prep 47th St Safety Enhancement

Closes 11/19/2026Opened 10/20/2026

City of Bremerton·Washington

81% match

SR 303 Adaptive Signals (Sheridan Rd to NE Riddell Rd)

Closes 11/20/2026Opened 10/29/2026

City of San Diego·California

80% match

Catalina Blvd Signal Interconnect

Closes 11/5/2026Opened 9/22/2026

City of Redlands·California

80% match

Church Street and San Bernardino Avenue Traffic Signal Installation

Closes 11/16/2026Opened 10/22/2026

California Department of Transportation·California

79% match

Modify the existing traffic control signals.

Closes 11/17/2026Opened 10/26/2026

City of Bakersfield·California

79% match

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 11/5/2026Opened 10/8/2026

City of Seattle·Washington

79% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Town of Westwood·Massachusetts

79% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Maryland State Highway Administration·Maryland

79% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Bakersfield·California

78% match

Traffic Signal and Lighting System at the Intersection of Calloway Drive and Etchart Road

Closes 11/19/2026Opened 10/29/2026

City of Clovis·California

78% match

Adaptive Signalization

Closes 11/17/2026Opened 10/22/2026

City of Toledo·Ohio

78% match

Traffic Signal Heads and Supplies

Closes 11/10/2026Opened 10/23/2026

Maryland State Highway Administration·Maryland

78% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

Port of San Diego·California

78% match

HARBOR POLICE HEADQUARTERS FACILITY IMPROVEMENTS

Closes 12/9/2026Opened 10/21/2026

City of Philadelphia·Pennsylvania

78% match

PW Prequalification for Bid -3023 FY27 Signal Synchronization and Knockdown

Closes 11/5/2026Opened 10/16/2026

California Department of Transportation·California

78% match

ADA curb ramps, high tension cable barrier, and LED lighting.

Closes 11/5/2026Opened 9/21/2026

Maryland State Highway Administration·Maryland

78% match

PGA435176 - MD 414 (St. Barnabas Road) from IS 95 Ramp 2 to MD 5 Ramp 5 Safety

Closes 12/3/2026Opened 10/27/2026

Town of New Milford·Connecticut

78% match

Grove Street and Hine Hill Road Signal Installation Project, LOTCIP No. L095-0006

Closes 11/5/2026Opened 9/18/2026

NYS Monroe County·New York

77% match

Traffic Signal Replacement: South Clinton Avenue @ Elmwood Avenue

Closes 12/1/2026Opened 10/29/2026

City of Asbury Park·New Jersey

77% match

Notice to Bidders - BID Traffic Calming, Bike and Pedestrian Safety Upgrades

Closes 11/24/2026Opened 10/29/2026

County of Los Angeles Department of Public Works·California

77% match

TDS0001709 - San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

City of Pueblo·Colorado

77% match

Construction of Sun Mountain Boulevard

Closes 11/4/2026Opened 9/22/2026

Los Angeles County Public Works·California

77% match

TDS0001709 San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

City of Santa Ana·California

77% match

Industrial Street Repair Program (Wilshire & Wright)

Closes 11/18/2026Opened 10/30/2026