The contract calls for the installation of two roadway assistance emergency towers (Talk‑A‑Phone units with integrated 12 MP cameras, surge protectors, and CAT‑6 cabling) on the Washtenaw Community College campus – one at the Occupational Education Building and one at the Henry Landau (Hoop House) West Roadway. The contractor must provide all labor, materials, and permits, install new 120 V/20 A and 208 V/30 A circuits, conduit, anchorage (under a separate contract), program and test the equipment, and deliver a one‑year warranty. Work must commence April 29 2026 and be completed by July 30 2026, with strict compliance to MI‑OSHA, prevailing‑wage, bonding, and insurance requirements.
• Supply and install emergency call‑boxes, cameras, surge protection, and associated low‑voltage and power wiring.
• Provide new electrical panels, breakers, and conduit runs from campus panels to each tower location, including site‑specific civil work (hydro‑excavation, hand‑hole installations).
• Perform programming, system integration, owner‑acceptance testing, and provide full documentation and warranty; maintain daily site safety, cleanup, and adhere to the detailed schedule and bonding/insurance obligations.