Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Construction
  5. ›HAPPY CANYON CREEK TRAIL CONNECTION PEDESTRIAN BRIDGE

Colorado Douglas County Community Development·Colorado

HAPPY CANYON CREEK TRAIL CONNECTION PEDESTRIAN BRIDGE

Closes 12/5/2025$250k – $600kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Douglas County Community Development is seeking bids for the design, fabrication, and delivery of a steel pedestrian bridge for the Happy Canyon Creek Trail Connection. The bridge will be a clear span, welded corrosion-resisting structural steel, truss pedestrian bridge with a concrete deck and abutment railings. Installation of the bridge will be under a separate contract as part of the larger trail project. The successful bidder will be required to provide proof of and the required limits of liability insurance, including Workers’ Compensation. • The bridge will be 12’-0” wide and 140’-0” long. • The bridge will have a concrete deck with a minimum thickness of four inches. • The bridge will have a steel toe rail and rubrails. • The bridge will have a vertical camber dimension at midspan equal to 100% of the full dead load deflection. • The bridge design shall meet all requirements of CDOT section 628 and referenced AASHTO standards. • The bridge shall be designed to prevent an accumulation of moisture at any point on the structure.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Maryna Sheveria; or Lynne Wilson

[email protected]; or [email protected]

(720) 733-6990; or (303) 814-4387

Key dates

Opened
11/19/2025
Questions due
11/26/2025
Closes
12/5/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
IFB-0000000002

Budget estimate

$250,000 – $600,000

The budget for this project can be estimated based on the scope of work, which includes the design, fabrication, and delivery of a steel pedestrian bridge. The cost of materials, labor, and equipment for such a project could range from $200,000 to $500,000, depending on the complexity of the design and the location of the project. Additionally, the cost of insurance, bonding, and other requirements may add to the overall cost. Therefore, a rough estimate for the budget could be between $250,000 and $600,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Minnesota Department of Administration·Minnesota

Top match · 67%

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

County of Marin·California

66% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

City of Columbia·Missouri

64% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

Cobb County·Georgia

63% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

U.S. Department Of Agriculture·California

63% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

Maryland Department Of General Services·Maryland

61% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

City of Palm Springs·California

61% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

Delaware River Joint Toll Bridge Commission·New Jersey

61% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

61% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Connecticut Town of Simsbury·Connecticut

61% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Connecticut Town of Cheshire·Connecticut

61% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

City of Elk Grove·California

61% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

California Department of Transportation·California

60% match

Temp bridge, deck portion Repl, hang conduit, & polyester Conc overlay

Closes 11/4/2026Opened 9/28/2026

City of Green Bay·Wisconsin

60% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Richmond·California

60% match

Richmond Greenway Bridge Project – Implementation Plan

Closes 11/19/2026Opened 10/19/2026

Division of Highways·North Carolina

60% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

Idaho Transportation Department·Idaho

60% match

Key No. 24698 DISCOVERY WAY, US 20/26 TO BRIDGER ST, BOISE

Closes 11/10/2026Opened 10/14/2026

BREC·Louisiana

60% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

City of Keene·New Hampshire

60% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

California Department of Transportation·California

60% match

Colorado River bridge replacement.

Closes 12/17/2026Opened 10/26/2026

Connecticut Town of Cheshire·Connecticut

60% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

City of Goshen, Indiana·Indiana

60% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

Cobb County, GA·Georgia

60% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

60% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026