Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›Conversion of Flat Roof to Truss System and Metal Roofing…

Town of Ware Shoals·South Carolina

Conversion of Flat Roof to Truss System and Metal Roofing Wastewater Treatment Plant- Office Facility

Closes 2/10/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Ware Shoals is soliciting proposals from qualified, licensed, contractors and/or design-build firms to remove the existing flat roof system at the Wastewater Treatment Plant Office Facility and replace it with a new pitched truss roof structure with a metal roofing system. The project involves the conversion of a flat roof to a truss system with metal roofing. The key aspects of the project include: • Removal of the existing flat roof system • Installation of a new pitched truss roof structure • Installation of a metal roofing system • The project is expected to be delivered using the design-bid-build method • The construction cost range is not specified, but bidders are required to submit three copies of their bids

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Morgan Hunt(Agency Project Coordinator)

[email protected]

(864) 456-7478

Key dates

Opened
1/15/2026
Closes
2/10/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
n/a

Budget estimate

$200,000 – $500,000

The budget for this project is difficult to estimate, as the construction cost range is not specified. However, based on the scope of the project, which involves the removal and replacement of a flat roof system with a new truss system and metal roofing, the cost could be significant. A rough estimate for a project of this nature could be in the range of $200,000 to $500,000, depending on the size of the roof, the materials used, and the complexity of the project. This estimate is based on the assumption that the project will require a significant amount of labor, materials, and equipment, and that the contractor will need to ensure that the new roof system is properly designed and installed to meet the needs of the Wastewater Treatment Plant Office Facility.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Northern Kentucky Water District·Kentucky

Top match · 75%

Roof Replacement for Fort Thomas Treatment Plant Chemical Building

Closes 12/4/2026Opened 10/30/2026

City of Chicago·Illinois

74% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

State University of New York (SUNY)·New York

71% match

25-01, 391031 - Reconstruct Roof at Facilities Building

Closes 12/8/2026Opened 10/22/2026

U.S. Department Of Agriculture·North Carolina

71% match

Roof Repair

Closes 11/10/2026Opened 10/7/2026

Town of Fountain Hills·Arizona

71% match

Town Campus Roof Rehabilitation Project [F4046]

Closes 11/2/2026Opened 9/17/2026

U.S. Department Of Defense·Mississippi

70% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

Erie County·New York

70% match

ERIE COUNTY SEWER DISTRICT NOS. 1&2 BIG SISTER WRRF INFLUENT ROOF & CAYUGA PS ROOF/VENTILATION REPLACEMENT CONTRACT NO. 103

Closes 11/4/2026Opened 10/6/2026

NYS Titan Roofing, Inc.·New York

70% match

Reconstruct Roof at Facilities Building – SUNY Poly

Closes 12/8/2026Opened 10/28/2026

City of Rosenberg·Texas

70% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

New York City Department of Design and Construction·New York

70% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 11/12/2024

NYS Titan Roofing, Inc.·New York

70% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 10/7/2026

Northeast Wisconsin Technical College·Wisconsin

70% match

Aurora Roof Replacement

Closes 11/10/2026Opened 10/19/2026

City of Palm Springs·California

70% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/10/2026Opened 10/13/2026

Michigan Detroit Public Schools Community District·Michigan

70% match

27-0052 FMP Series 6 Roof Replacement for Cass Tech, Emerson

Closes 11/13/2026Opened 10/29/2026

Town of Queen Creek·Arizona

70% match

Design/Build - Industrial Wastewater Treatment Facility

Closes 12/8/2026Opened 10/22/2026

U.S. Department Of The Interior·Colorado

69% match

Z--SLV-CB PUMPING PLANT ROOF

Closes 11/2/2026Opened 10/8/2026

New York City Department of Design and Construction·New York

69% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 4/24/2025

The University of North Carolina·North Carolina

69% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

Northeast Ohio Medical University·Ohio

69% match

Roof Replacement 26, 27, 35, and 37

Closes 11/4/2026Opened 10/7/2026

The Trustees of the California State University·California

69% match

SJSU Simpkins Stadium Center Roof & HV Replacement

Closes 12/10/2026Opened 10/26/2026

Michigan Detroit Public Schools Community District (DPSCD)·Michigan

69% match

27-0052 FMP Series 6 Roof Replacement for Cass Tech, Emerson

Closes 11/13/2026Opened 10/28/2026

Ohio Department of Rehabilitation and Correction·Ohio

69% match

McKinley Ave Roof-DRC270104-714

Closes 11/4/2026Opened 10/20/2026

The State of Missouri Office of Administration·Missouri

69% match

Scruggs Station Warehouse Complex - Porite Roof Elect & HVAC Rep - Fairgrounds Warehouse

Closes 11/5/2026Opened 10/22/2026

Connecticut Town of Monroe·Connecticut

69% match

Architectural & Engineering Design Services Roof Replacement - Jockey Hollow

Closes 11/2/2026Opened 10/21/2026

New York City Department of Design and Construction·New York

69% match

INSTALLATION OF COLD FLUID APPLIED REINFORCED MEMBRANE ROOFING SYSTEM

Rolling / TBD closeOpened 6/17/2016