The City of Fairfield is soliciting bids for a 270‑day construction contract to extend and improve the Great Miami River Trail, including new asphalt paving, utility relocations, drainage improvements, and related site work. The scope encompasses clearing, subgrade preparation, base and asphalt surfacing, curb & gutter installation, curb ramps, erosion‑control measures, tree planting, fence work, and installation of solar‑powered rapid‑flashing beacons at a pedestrian crossing. The project must comply with ODOT specifications, prevailing‑wage rules, Buy‑America requirements, and a drug‑free safety program.
• 6,000 ft of new 11‑ft wide shared‑use asphalt trail plus resurfacing of ~3,500 ft of existing trail.
• Coordination with Duke Energy (electric & gas), Altafiber, Spectrum/Charter, and City water & sewer utilities.
• Comprehensive erosion‑control BMPs (filter strips, geotextile mats), landscaping (tree planting), and fencing.
• Required documentation includes bid bond, performance/payments bonds, SBE utilization plan, non‑collusion affidavit, and various ODOT compliance forms.