The City of Woodstock, GA is seeking qualified contractors to design and construct an 8‑foot multi‑use trail along Rope Mill Road, including storm‑water drainage upgrades, road widening, curb & gutter, catch basins, driveway reconstruction, a traffic‑calming island, and thermoplastic striping. The work must meet GDOT and ADA standards and be completed within 90 calendar days after a Notice to Proceed. Bids are due electronically by September 22, 2026; a non‑mandatory virtual pre‑bid conference is scheduled for August 27, 2026. The contract will require performance and payment bonds, general liability, workers’ compensation, and other insurance, with a 5 % bid bond and liquidated damages of $250 per day for late completion.
• Scope: trail construction, road widening, curb & gutter, storm‑drain installation, catch basins, driveway work, traffic‑calming island, signage & thermoplastic markings.
• Required GDOT pre‑qualification for all bidders and subcontractors.
• Estimated project duration: 90 days from NTP.
• Mandatory insurance and bonding (5 % bid bond, 100 % performance/payment bond).
• Pre‑bid conference (optional) on Aug 27, 2026 (virtual).
• Questions due by Sep 3, 2026; bid submission deadline Sep 22, 2026.