Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Energy and Utilities
  5. ›King Mountain to Grand Falls Terminal Station Construction

City of Garland·Texas

King Mountain to Grand Falls Terminal Station Construction

Closes 12/5/2025$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The King Mountain 345kV Station Grandfalls terminal addition project is located at 5686 FM 2463, McCamey, Texas, 79752. The project involves the relocation of the existing McCamey North line position to the southern "Future" Bay 4 position, and the installation of new equipment, including a 345kV Dead-end A-frame, circuit breaker, disconnect switches, surge arrestors, and combo metering units. The contractor will be responsible for demolishing bus sections, removing structures and foundations, and installing new foundations, structures, and electrical equipment. The project must meet an in-service date of 4/1/2026. Key aspects of the project include: • Demolition of bus sections and removal of structures and foundations • Installation of new foundations, structures, and electrical equipment • Relocation of existing equipment, including combo metering units and circuit breaker • Installation of new conduit system and grounding system • Pulling of conductors and installation of fiber optic cable • Removal of static wire and installation of new static wire

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Teresa Smith(Purchasing Manager)

[email protected]

(972) 205-2421

Key dates

Opened
11/11/2025
Questions due
11/26/2025
Pre-bid meeting
11/19/2025
Closes
12/5/2025
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
237130
Solicitation №
REQ00000917 Addendum 2

Budget estimate

$5,000,000 – $15,000,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves the construction of a new power line, installation of electrical equipment, and demolition of existing structures. The cost of materials, labor, and equipment rental will be significant. Considering the complexity of the project and the materials required, a rough estimate of the budget could be between $5 million and $15 million. Factors that may influence the likely payment range include the cost of materials, labor costs, equipment rental costs, and the contractor's overhead and profit margins.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Transportation·Wyoming

Top match · 66%

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

Massachusetts Port Authority (Massport)·Massachusetts

65% match

Terminal C Redevelopment Logan International Airport

Closes 11/6/2026Opened 10/21/2026

Grand River Dam Authority - GRDA·Oklahoma

64% match

Tonnece 69 kV Terminal Addition Project - Substation & Transmission

Closes 11/20/2026Opened 10/26/2026

Missouri Department of Transportation·Missouri

64% match

City of De Soto, Construction of a new Amtrak station, sidewalks, station platform, canopy, etc.

Closes 11/20/2026Opened 10/22/2026

MTA - NYC Transit (NYCT)·New York

63% match

PMC Services for Metro-North Railroad’s Grand Central Terminal Existing Security System SOGR and Expansion

Closes 12/4/2026Opened 10/26/2026

Vantage Group - Boston Logan Terminal C Redevelopment·Massachusetts

63% match

Construction Management at Risk Services for Logan Terminal C Redevelopment

Closes 11/6/2026Opened 10/21/2026

U.S. Department Of Transportation·Wyoming

63% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/28/2026

Metropolitan Council·Minnesota

63% match

Notice of Intent to Solicit Blue Line Franklin Station Renovation

Closes 11/20/2026Opened 10/14/2026

City of Douglas WY·Wyoming

63% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026

U.S. Department Of Transportation·Washington

63% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/2/2026

City of Bellevue·Washington

63% match

Meydenbauer Bay Park Phase 2 - GC/CM Services

Closes 12/4/2026Opened 10/22/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

63% match

DOT&PF Notice of Public Open House No. 3: King Salmon Airport Master Plan Update

Rolling / TBD closeOpened 9/4/2026

U.S. Department Of Health And Human Services·South Dakota

62% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

U.S. Department Of Transportation·Washington

62% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

U.S. Department Of Transportation·Washington

62% match

MT FLAP SILVER 2021(1), Roosevelt Drive Safety and Realignment Project

Closes 7/27/2028Opened 7/27/2026

Connecticut Town of Simsbury·Connecticut

62% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Alaska Department of Transportation and Public Facilities·Alaska

62% match

ITB: . 0091022/SFHWY00696; KTN Ferry Terminal Electrical and Mechanical Improvements

Closes 11/19/2026Opened 10/23/2026

U.S. Department Of Defense·Idaho

62% match

Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID

Closes 11/12/2026Opened 10/28/2026

Franklin County Board of County Commissioners·Florida

62% match

ITB- AIRPORT WEST HANGER DEVELOPMENT

Closes 12/14/2026Opened 10/28/2026

U.S. Department Of Transportation·Washington

62% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 9/23/2026

U.S. Department Of Transportation·Montana

61% match

MT FLAP SILVER 2021(1), Roosevelt Drive Safety and Realignment Project

Closes 7/27/2028Opened 7/27/2026

City of Boise·Idaho

61% match

Boise Airport Vertical Transportation Equipment

Closes 11/4/2026Opened 10/7/2026

City of Cleveland·Ohio

61% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026