The City of Reno is soliciting bids for the partial rehabilitation of two wastewater lift stations – Eagle Ridge and South Dakota. Work includes demolition of existing structures, installation of new wet‑well vaults, pumps, valve vaults, pipe, electrical and control systems, site grading, fencing, lighting, tree replacement, and related civil and mechanical tasks. The contract is a fixed‑price public‑works bid with a base schedule of 115 calendar days and a target substantial completion date of 1 Dec 2027. The bid package is available on PlanetBids and requires a 5 % bid bond, 100 % performance and labor‑materials bonds, and compliance with Nevada prevailing‑wage, apprenticeship, and safety statutes.
• Demolition, de‑watering, and construction of new lift‑station wet‑well, valve vaults, and concrete pads.
• Installation of new sub‑mersible pumps, mixers, VFDs, generators, SCADA/RTU, and full electrical power & control systems.
• Comprehensive civil work: grading, new force‑main, sanitary‑sewer, water mains, storm‑drain, erosion‑ and dust‑control, fencing, lighting, and tree‑root mitigation.
• Mandatory pre‑bid site visit on 26 Feb 2026 (optional), online Q&A through 4 Mar 2026, and bid submission by 11 Mar 2026.