Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Memory Lane and Flower Street Bikeway and Traffic Calming

City of Santa Ana·California

Memory Lane and Flower Street Bikeway and Traffic Calming

Closes 6/30/2026$250k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Santa Ana is seeking qualified contractors to design‑build a Class IV protected bike lane along Memory Lane and Flower Street, together with extensive pedestrian, roadway, utility, and landscape improvements. The work includes new curb‑and‑gutter, sidewalks, medians, bio‑retention basins, irrigation system upgrades, traffic‑signal modifications (LED heads, hybrid beacons, controllers), water‑main replacement, storm‑drain construction, and associated signage and striping. The contract is a sealed‑bid solicitation with a $4.85 M estimated value, a 120‑working‑day construction schedule, and $5,200 per day liquidated‑damage penalty for overruns. Bidders must provide a 10 % bid bond, meet California Class A contractor licensing, prevailing‑wage, insurance, bonding, and Community Workforce Agreement requirements. • Scope covers concrete pavement, curb‑and‑gutter, bike‑lane, sidewalks, medians, drainage, irrigation, traffic‑signal hardware, water‑main and fire‑hydrant work. • All work must comply with CalTrans, CSA, CALGreen, NPDES, and City standards; extensive documentation (as‑built, O&M manuals, warranties) is required at close‑out. • The project is funded by a Caltrans Active Transportation Program grant and includes a $17,813 construction‑permit fee.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
6/9/2026
Questions due
6/23/2026
Closes
6/30/2026
Duration
120 Working Days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
Project #23-6037

Budget estimate

$250,000 – $500,000

The solicitation lists an estimated project value of $4,850,000. Assuming typical contractor profit margins of 5‑10 % for public‑works projects of this size, the net earnings for the prime contractor would likely fall between $240,000 and $485,000. Additional revenue could arise from change‑order work or ancillary sub‑contracts, but the base estimate remains in that range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Tucson·Arizona

Top match · 62%

Sahuara and Copper/Flower Bicycle Boulevards - FHWA

Closes 11/3/2026Opened 9/24/2026

City of Asbury Park·New Jersey

62% match

Notice to Bidders - BID Traffic Calming, Bike and Pedestrian Safety Upgrades

Closes 11/24/2026Opened 10/29/2026

City of Rancho Palos Verdes·California

60% match

Miraleste Traffic Calming Measures, CIP No. 8858

Closes 11/20/2026Opened 10/27/2026

City of Charlotte·North Carolina

60% match

Shamrock Drive Complete Street

Rolling / TBD closeOpened 4/1/2027

City of Pasadena·California

60% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

LA Public Works Engineering Bureau·California

60% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

City of Doge City·Kansas

59% match

Trail St & Overpass CCLIP (closed 10/20)

Rolling / TBD closeOpened 9/15/2026

NYS East Fishkill, Town of·New York

59% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Hampton·Virginia

59% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

New York City Department of Design and Construction·New York

59% match

85026B0091 - HWX405 - SOUTHERN BOULEVARD BICYCLE AND PEDESTRIAN SAFETY IMPROVEMENTS, THE BRONX

Closes 11/5/2026Opened 5/4/2026

City of Rancho Cordova·California

59% match

Traffic Safety Action Plan

Closes 11/13/2026Opened 10/9/2026

City of Richmond Government·Virginia

59% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Charleston County·South Carolina

58% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of North Augusta·South Carolina

58% match

US 25 (Georgia Avenue) Traffic Calming

Closes 11/12/2026Opened 10/26/2026

City of Green Bay·Wisconsin

58% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Charlotte·North Carolina

58% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

NYS Monroe County·New York

58% match

Traffic Signal Replacement: South Clinton Avenue @ Elmwood Avenue

Closes 12/1/2026Opened 10/29/2026