The Gatesville ISD is seeking proposals for the removal and replacement of the synthetic track at their high school stadium. The project includes removing the existing track surfacing system, disposing of it off-site, and installing approximately 5,800 square yards of new track material. The successful bidder will be responsible for completing the work, including basic striping, and cleaning up as necessary. The temperature must be 50 degrees or rising, with minimal wind, for any surface activities.
• The project requires the removal of the existing track surfacing system from the track oval D-zone and one long jump runway.
• The installation of approximately 5,800 SY of epiQ Tracks S200 black 13mm permeable paved mat, or equivalent, and structural spray polyurethane surfacing system on the track oval and events.
• Basic striping not to include lettering, logos, or distance tick marks.
• Clean up as necessary.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.