Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Louisiana guideLouisiana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Louisiana
  4. ›Construction
  5. ›Area 1 Drainage Improvements

St. Tammany Parish Government·Louisiana

Area 1 Drainage Improvements

Closes 6/16/2026$2M – $5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

St. Tammany Parish is soliciting bids for “Area 1 Drainage Improvements,” a highway‑street‑bridge construction project that will upgrade storm‑drain infrastructure and widen turning radii on five road segments in Covington, LA. The work includes installing 18‑in. and 24‑in. storm‑drain pipe, catch basins, cross‑drain safety ends, temporary traffic control, full‑depth asphalt paving, asphalt patching, erosion control (centipede sod, rip‑rap, borrow soil), and related site preparation. Bids must include a 5 % bid bond, corporate resolution, and comply with LDOTD specifications. The contract must be completed within 60 calendar days after award. • Install storm‑drain pipe (18‑in. RCPA equivalent on River Rd; 24‑in. HP storm on other roads) and catch basins. • Perform traffic control, widen turning radii, and repave with 2‑in. Superpave asphalt (PG 67‑22). • Provide full‑depth asphalt patches, erosion‑control measures, and required signage. • Submit sealed bids by 2 PM on 16 June 2026; bid security = 5 % of total bid; contract duration 60 days.

Attached files

Contact

Michael B. Cooper(Parish President)

[email protected]

(985) 898-2520

Key dates

Opened
5/13/2026
Questions due
6/5/2026
Closes
6/16/2026
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
26-28-2

Budget estimate

$2,000,000 – $5,000,000

The bid package does not disclose a total contract amount, but a typical drainage‑improvement project of this scale (multiple roadways, 600 + linear feet of pipe, 13 catch basins, 2 ,000 sq yd of asphalt, plus ancillary work) generally falls in the $2 million to $5 million range. Factors influencing the final figure include material prices (pipe, asphalt), mobilization costs, and any unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Miami‑Dade County Department of Transportation and Public Works·Florida

Top match · 70%

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 10/23/2026

City of Charlotte·North Carolina

69% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

City of Virginia Beach·Virginia

69% match

COVB-26-101639-2 - Central Resort District Drainage Improvement Phase 1 Design-Build

Closes 11/5/2026Opened 10/23/2026

City of Easley·South Carolina

69% match

North Dale Drive Drainage System Improvements

Closes 1/28/2027Opened 10/16/2026

City of Charlotte·North Carolina

68% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

68% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of North Charleston·South Carolina

68% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

Kossuth County Drainage District No. 20 Main 2·Iowa

68% match

Kossuth County Drainage District No. 20 Main 2 Tile Improvement BMI Project No. 25X.138901

Closes 11/17/2026Opened 10/29/2026

City of Charlotte·North Carolina

68% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of Brandon·Mississippi

68% match

BROOKSTONE PLACE DRAINAGE IMPROVEMENTS

Closes 11/20/2026Opened 10/21/2026

Town of South Hill·Virginia

68% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

City of Charlotte·North Carolina

68% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Miami-Dade County·Florida

68% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 11/6/2025

City of South Miami·Florida

67% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

City of Valdosta·Georgia

67% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

Sewerage and Water Board of New Orleans·Louisiana

67% match

Drainage Point Repairs

Closes 11/13/2026Opened 10/20/2026

City of Charlotte·North Carolina

67% match

Fawnbrook Ln (514) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/1/2026

Jackson County Utility Authority·Mississippi

67% match

WJC Process Improvements Phase 1

Closes 12/8/2026Opened 8/16/2026

Maryland Baltimore City Department of Public Works·Maryland

67% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

67% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

City of North Charleston·South Carolina

67% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

City of South Lake Tahoe·California

67% match

Drainage Master Plan Update & Areawide Facility Analyses

Closes 11/17/2026Opened 10/1/2026

City of Charlotte·North Carolina

67% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Oldsmar·Florida

67% match

State Street Drainage Ditch Improvements Project

Closes 11/19/2026Opened 9/25/2026

City of Charlotte·North Carolina

67% match

Collective AJ Storm Drainage Improvement Projects

Rolling / TBD closeOpened 3/29/2026