Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New York
  4. ›Construction
  5. ›OASAS C.K. Post Addiction Treatment Center No. 854 Roof…

Dormitory Authority of the State of New York·New York

OASAS C.K. Post Addiction Treatment Center No. 854 Roof Replacement and Asbestos and HAZMAT Abatement

Closes 11/18/2026
Get bids like this by emailBid source

Description

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLYSee the Eligibility Requirements further down in this document.Remove existing roof and replace with fluid-applied polymethyl-methacrylate (PMMA) roofing system with R-33 ci insulation and associated fluid-applied PMMA flashing system. The new roof system will have a 30-year warranty.Remove existing coping/fascia assembly and provide aluminum coping system at main roof parapet. Raise the height of the low parapets to accommodate the new roof assembly and meet the minimum flashing height requirements.Remove existing fascia assembly and provide aluminum fascia system at fire stair tower roof edge.Remove and replace scupper and conductor head.Remove and replace stainless steel counter flashing along base of attic walls.Provide fluid applied flashing at mechanical equipment curbs and roof penetrations. Provide additional wood blocking to increase curb height. Provide pipe extensions to meet code requirements.Remove and replace guy wire support anchor.Remove and replace hollow metal doors and raise the door curb.Remove and replace ship ladder in the center attic.Provide free-standing guardrails along roof edge.Provide walkway protection pads.Repair cracked and/or spalled concrete deck.Hazardous materials abatement.Estimated Cost Range: $6,200,000 to $6,800,000Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice.Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid.Please find links to the specifications and drawings below:Project ManualDrawingsGeneral Conditions for Construction dated February 4, 2026, will apply to the Contract Documents.The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows:Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45%Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18% Women's Business Enterprise Goal 12% Service-Disabled Veteran Owned Businesses 6%Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid.Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to [email protected] receipt, confirmation of delivery will be provided by email for each submission. If a firm does not receive confirmation of receipt, the EOI package shall be deemed not received. Firms are responsible for ensuring that confirmation of receipt is obtained and should follow up promptly if confirmation is not received.Instructions for Submission of the EOI Packages:Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection.Each package shall be submitted with:A Cover Page that clearly identifies:The Legal Name of the Company submitting the EOIThe Project Name for which the EOI is being submittedThe Date of SubmissionImmediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number.The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation.All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation.Tabs must be in the following sequence: Tab 1 – Company ProfileProvide a company profile that includes the following information:Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project.Date Established – When the company was founded.Company Address – Primary business location.Ownership Information – Name and resumes of all principal owners.Client List – Summary of public and private sector clients.Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers.Equipment - Overview of all equipment owned by the company.Self-Performed Services - Description of all services the company performs directly (not subcontracted).Tab 2 – ExperienceProvide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed.Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information:Name of the project designerFirm name and contact informationProject title and location/facilityBrief description of the projectTotal construction costConstruction start dateSubstantial completion dateIndicate role as prime contractor or subcontractorPercentage of the work that was self-performedIf applicable, also include a list of all DASNY projects completed within the last 5 years.Tab 3 – Project SchedulesProvide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project.Tab 4 – Safety ProgramProvide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety.Tab 5 – RésumésProvide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative.Tab 6 – Potential SubcontractorsProvide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work.Tab 7 – Anticipated WorkloadProvide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe.Tab 8 – Experience Modification RatingProvide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation.Tab 9 – Bonding CapacityProvide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements.Tab 10 – NYS Vendor Responsibility QuestionnaireProvide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy.Eligibility/Qualifications Requirements/Preferences:Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY.Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and [email protected]. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
10/21/2026
Closes
11/18/2026

Last updated

Details

Industry
Construction
NAICS
236220

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Dormitory Authority of the State of New York·New York

Top match · 99%

OASAS C.K. Post Addiction Treatment Center No. 854 Roof Replacement and Asbestos and HAZMAT Abatement - Project No. 388420

Closes 11/18/2026Opened 10/21/2026

Dormitory Authority of the State of New York·New York

89% match

CUNY Lehman College Music Bldg & Old Gym Window Replacement and Asbestos and HAZMAT Abatement - Project No. 360070

Closes 11/12/2026Opened 10/14/2026

Dormitory Authority of the State of New York·New York

89% match

CUNY Lehman College Music Bldg & Old Gym Window Replacement and Asbestos and HAZMAT Abatement

Closes 11/12/2026Opened 10/14/2026

Dormitory Authority of the State of New York·New York

87% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 9/25/2026

NYS Titan Roofing, Inc.·New York

84% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 10/7/2026

Dormitory Authority of the State of New York·New York

84% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 9/25/2026

Dormitory Authority of the State of New York·New York

83% match

OMH Hutchings Psychiatric Center Replace Boilers in Buildings 16 & 17 including Asbestos and Hazardous Materials Abatement

Closes 11/19/2026Opened 10/14/2026

Dormitory Authority of the State of New York·New York

82% match

OMH Hutchings Psychiatric Center Replace Boilers in Buildings 16 & 17 including Asbestos and Hazardous Materials Abatement

Closes 11/19/2026Opened 10/14/2026

State University of New York (SUNY)·New York

81% match

25-01, 391031 - Reconstruct Roof at Facilities Building

Closes 12/8/2026Opened 10/22/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

81% match

Project: AFKC-STU-Annex Roof Replacement - Ann Klein Forensic Center – Special Treatment Unit Annex

Closes 12/15/2026Opened 10/28/2026

MTA - NYC Transit (NYCT)·New York

80% match

D81802 - Project Management Consultant Services for Roof Replacement at Bathgate (State).

Closes 12/9/2026Opened 10/30/2026

New York City Department of Design and Construction·New York

80% match

INSTALLATION OF STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMEN ROOFING SYSTEM

Rolling / TBD closeOpened 2/19/2015

New York City Department of Education·New York

80% match

Bid Extension: Best Value Requirements Contract for Asbestos Hazard Emergency Response Act (AHERA) Management Plan and Laboratory Services for Asbestos Bulk Sampling and Analysis

Rolling / TBD closeOpened 9/3/2024

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

80% match

Roof Replacement for Outer Housing Units

Closes 11/10/2026Opened 9/29/2026

NYS State University Construction Fund·New York

80% match

Replace Roofs - Various Buildings

Closes 11/10/2026Opened 10/16/2026

New York City Department of Education·New York

80% match

Bid Extension: Requirements Contract for Asbestos Abatement

Rolling / TBD closeOpened 3/23/2021

Loudoun County Public Schools·Virginia

80% match

2027 Roof Renovation Program - Seldens Landing ES

Closes 11/5/2026Opened 10/13/2026

U.S. Department Of Defense·Colorado

80% match

Pre-Solicitation Notice - $99M SB Roofing MATOC

Closes 8/10/2027Opened 8/10/2026

NYS Titan Roofing, Inc.·New York

80% match

47971CHE: Replace Roof & Associated Mechanicals

Closes 11/17/2026Opened 10/19/2026

Nassau BOCES·New York

80% match

26/27-054 Roof Maintenance and Repairs

Closes 11/17/2026Opened 10/20/2026