Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Engineering Services
  5. ›SEPTA 31st St. Pump Rebuild Service

Southeastern Pennsylvania Transportation Authority·Pennsylvania

SEPTA 31st St. Pump Rebuild Service

Closes 9/30/2026$20k – $100kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

SEPTA is seeking a qualified vendor to rebuild a FLYGT pump located on 31st Street, using original equipment manufacturer (OEM) parts. The work includes complete disassembly, inspection, replacement of worn components with OEM parts, reassembly, testing, and delivery of a fully functional pump ready for service. The contract is categorized as a “Quotes” solicitation, indicating a competitive price‑based selection. • Rebuild of a specific FLYGT pump – OEM parts required. • Scope includes all labor, parts, testing, and documentation of work performed. • Vendor must meet SEPTA’s insurance and compliance requirements (see attached “Vendor Required Insurance”). • Submission deadline is 4:30 pm on September 30, 2026; no pre‑bid meeting or site visit is mentioned. • Contact for questions is Joshua McAdams (email and phone provided).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Joshua McAdams

[email protected]

(215) 537-6350

Key dates

Opened
9/19/2026
Closes
9/30/2026

Last updated

Details

Type
Request for Quotation
Industry
Engineering Services
NAICS
811111
Solicitation №
JMM192342832

Budget estimate

$20,000 – $100,000

The rebuild of a large FLYGT pump typically ranges from $20 k for a straightforward overhaul to $100 k for a complex rebuild with extensive OEM parts and testing. Factors influencing cost include pump size, condition, part availability, labor rates, and any required certifications. Given SEPTA’s public‑sector budget constraints, the estimate leans toward the mid‑range of $30‑70 k, but the full spread is provided to account for variability.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

New York City Department of Environmental Protection·New York

Top match · 68%

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

Santa Clara Valley Water District·California

68% match

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026Opened 10/20/2026

New York City Department of Environmental Protection·New York

67% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

City of Branson·Missouri

67% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

City of San Diego·California

66% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Redding·California

65% match

Overhaul of Two (2) Boiler Feedwater Pumps, Motors & Valves

Closes 12/4/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

The City of Columbus·Ohio

65% match

RFQ033955 - 6009 HCWP 2026 HIGH SERVICE #12 PUMP MOTOR REBUILD

Closes 11/3/2026Opened 10/28/2026

City of Phoenix·Arizona

64% match

Septic Tank Pumping Services

Closes 11/10/2026Opened 10/19/2026

City of Key West·Florida

64% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

64% match

PUMP,ROTARY

Closes 11/2/2026Opened 10/22/2026

U.S. Department Of Veterans Affairs·New York

64% match

Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT

Closes 11/11/2026Opened 10/29/2026

City of Cambridge·Massachusetts

64% match

FY27 Pump Station and Sewer and Stormwater Structures Inspection and Maintenance

Closes 11/19/2026Opened 10/29/2026

Massachusetts Town of Hopkinton·Massachusetts

64% match

GROVE STREET TANK REHABILIATION

Closes 11/18/2026Opened 10/28/2026

New York City Department of Environmental Protection·New York

64% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

64% match

Construction Management for the 30th Street WestCatenary Replacement Project – Phase 1A

Closes 11/5/2026Opened 9/21/2026

Gwinnett County Government·Georgia

64% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026