This market survey seeks to gauge interest and capability of firms—particularly small and disadvantaged businesses—to design, build, and commission a resilient micro‑grid at the United States Army Garrison Ansbach, Katterbach Kaserne, Germany. The project is a Design/Bid/Build effort to install solar PV, diesel generators, battery storage, control systems, and related electrical infrastructure to provide islandable, black‑start capability. Contractors must demonstrate experience on comparable micro‑grid installations, including diesel generation, PV arrays, battery energy storage, switchgear, duct banks, and commissioning, and must be able to self‑perform at least 15 % of the work. Respondents must submit a capability statement via the provided survey form by the deadline.
• Scope: Full design, construction, installation, and commissioning of a micro‑grid (≈0.5‑2.5 MW diesel, 0.5‑1.5 MW PV, 2‑10 MWh BESS).
• Estimated contract value: $25 M–$100 M; duration ~743 calendar days.
• Target firms: Other‑than‑Small, Small Business, HUBZone, 8(a), WOMEN‑OWNED, or Service‑Disabled Veteran‑Owned businesses.