The City of Parkville is soliciting bids for the design‑build construction of the Platte Landing Park Trail Improvements. The scope includes demolition of existing asphalt trail, boardwalk, and related improvements; construction of a new concrete multi‑use trail (10‑ft wide, tapering to 6‑ft in constrained areas); new parking lot with 28 standard and 10 ADA spaces, pavement markings, signage, and ADA‑compliant routes; extensive grading, drainage, culvert, crosswalk, and storm‑water management work; utility relocations; erosion and sediment control; tree protection and selective removal; landscaping, planting, and site restoration. A bid bond is required. The project is located at 300 S. Main Street, Parkville, MO, and the pre‑bid conference will be held on‑site at the baseball field on Sep 16, 2026. Bidders must submit a signed copy of the plans and specifications, and all work must comply with City technical specifications, ADA standards, and applicable state/federal regulations.
• Demolition of existing trail and boardwalk, removal of asphalt and concrete sections.
• New 10‑ft concrete multi‑use trail with ADA transitions, connections to sidewalks, parking, and pedestrian bridge.
• Construction of parking lot (28 regular + 10 ADA spaces) with pavement markings and signage.
• Grading, drainage, culverts, crosswalks, and storm‑water improvements (rain garden, SWPPP).
• Utility relocations (water, gas, electric, sewer, telecom, fiber).
• Tree protection, selective removal, and extensive landscaping/planting.
• Required bid bond, pre‑bid conference, and adherence to erosion‑control and site‑restoration requirements.