Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Construction
  5. ›100th Avenue Multimodal Path

City of Thornton·Colorado

100th Avenue Multimodal Path

Closes 7/24/2026$950k – $1.3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Thornton is seeking competitive bids to design‑build and construct a new 1,150‑ft, 8‑ft wide concrete multimodal pathway along 100th Avenue, including curb‑and‑gutter, pedestrian‑friendly lighting, ADA‑compliant ramps, and upgraded storm‑drain infrastructure. The contract is a fixed‑price unit‑price agreement, with a 5 % bid bond, 100 % performance and payment bonds, and a 120‑day completion window from the Notice to Proceed. Key elements of the scope include: • New detached concrete sidewalk (≈ 1,150 ft) with integrated streetlights (LED, 11,400 lumens) and a crosswalk. • Installation of four to five storm‑drain inlets, relocation of an existing ditch‑lateral, and replacement of a 10‑inch culvert with three new 12‑inch culverts. • Required erosion‑control, soil‑stabilization, and landscaping (topsoil, seeding, mulching, no‑xious‑weed management). • Compliance with CDOT 2025 Standard Specifications, Buy‑America, Davis‑Bacon wage rates, and extensive reporting (DRB, claims, OJT, certified payroll).

Attached files

Contact

Keith Griess(Senior Contract Administrator)

[email protected]

Key dates

Opened
7/2/2026
Questions due
7/14/2026
Pre-bid meeting
7/9/2026
Closes
7/24/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
23-105

Budget estimate

$950,000 – $1,300,000

The bid tabulation shows total bid amounts ranging from roughly $976,000 to $1,092,000, with the highest compiled total at $1,258,296. Assuming the winning bidder’s price will be near the median of these figures, a reasonable expectation for contract value is between $950,000 and $1,300,000. This range reflects the scope’s mix of heavy civil works (excavation, drainage, concrete), specialty lighting, and environmental mitigation, all of which drive cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Idaho Transportation Department·Idaho

Top match · 64%

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

Missouri Department of Transportation·Missouri

62% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Missouri Department of Transportation·Missouri

61% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Cincinnati·Ohio

61% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Charlotte·North Carolina

60% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Missouri Department of Transportation·Missouri

60% match

SW District, City of Ozark, Construction of two multiuse trail projects

Closes 11/12/2026Opened 10/14/2026

City of Kearney·Missouri

59% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

State of Delaware DOT·Delaware

59% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

Los Angeles County Public Works·California

59% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

City of Brandon·Mississippi

59% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026

City of Harrisonburg·Virginia

59% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Massachusetts Department of Transportation·Massachusetts

59% match

609204 BELMONT FAP No. STP/CMQ/TAP-0034(035)X Community Path, Belmont Component of the MCRT (Phase

Closes 11/10/2026Opened 9/14/2026

City of Cincinnati·Ohio

59% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Missouri Department of Transportation·Missouri

58% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026

City of Austin·Texas

58% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

Minnesota Department of Transportation·Minnesota

58% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

58% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

City of Fairfield·Ohio

58% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

City of Toledo·Ohio

58% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

City of Pasadena·California

58% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

City of Elk Grove·California

58% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

LA Public Works Engineering Bureau·California

57% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

Virginia Department of Transportation·Virginia

57% match

A46_2027 SMART SCALE - SHARED USE PATH

Closes 11/18/2026Opened 10/14/2026

City of Charlotte·North Carolina

57% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Hampton·Virginia

57% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026