The City of Baxley is seeking bids for the TIA 2 Band 2 roadway construction project. The project includes traffic control, erosion control measures, and construction of RAC Superpave Leveling, RAC Superpave topping, and variable depth milling. The work must be completed within 180 consecutive calendar days of the notice to proceed.
Key aspects of the project include:
• Roadway construction along multiple paved roads
• Traffic control and erosion control measures
• Construction of 1,524 TN of RAC Superpave Leveling and 5,439 TN of 9.5mm RAC Superpave topping
• Variable depth milling and striping
• Completion of the project within 180 consecutive calendar days