Turner Construction Company, acting as the design‑builder for the Terminal 3 West Modernization project, is seeking to pre‑qualify a subcontractor to perform the complete East Exterior Wall package. The work includes design, engineering, pre‑construction, and construction of metal stud framing, plaster, metal panels, glazing, and skylights. Structural demolition will be handled by other contractors. Bidders must submit pre‑proposal drawings for review before delivering a lump‑sum, no‑qualification proposal. The bid deadline is September 14, 2026 at 5:00 PM, with an estimated project cost of $20 million. The primary contact for qualification criteria and package details is Briana Padilla.
• Trade Package No. 173 – East Exterior Wall
• Scope: design, engineering, pre‑construction, construction (metal stud, plaster, metal panels, glazing, skylights)
• Estimated cost: $20 M
• Bid due: 09/14/2026 5:00 PM (lump‑sum, no‑qualification)
• Pre‑qualification required; submit pre‑proposal drawings first
• Contact: Briana Padilla,
[email protected]
• Project located at San Francisco International Airport (implied by “SFO”) but location not explicitly stated in the text.