This solicitation calls for the complete replacement of Bridge #1 on Ledgewood Drive (Township Road 398) in Medina Township, Ohio. The work includes demolition of the existing corrugated‑metal‑pipe arch, installation of a new corrugated‑aluminum‑pipe arch culvert, full concrete footers and wingwalls, roadway reconstruction, fence removal/installation, utility relocation, and associated earthwork, drainage, and traffic‑control measures. The project is funded jointly by the Ohio Public Works Commission (OPWC) and Medina County, with an estimated overall cost of roughly $305 K. The contractor must provide a full bid guaranty (bond or 10 % cash/letter of credit), comply with Ohio prevailing‑wage rules, submit weekly certified payroll, and furnish the required performance and maintenance bonds. The construction window is limited to a November 1 2026 completion, with a maximum 60‑day road closure.
• Demolition of existing bridge and removal of utility lines, followed by installation of an 11‑9″ × 7‑2″ corrugated aluminum pipe arch culvert.
• Full concrete work (headwalls, footings, pavement, sidewalks) complying with ODOT specifications, plus seeding, mulching, and erosion‑control.
• Traffic‑control, utility coordination, and compliance with Ohio ethics, EEO, and de‑barment certifications.