Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›T.H. 398 LEDGEWOOD Drive Bridge No. 1 Replacement Project…

Medina County - Engineering·Ohio

T.H. 398 LEDGEWOOD Drive Bridge No. 1 Replacement Project – OPWC Project No. CI42AC (Re‑Bid)

Closes 7/10/2026$250k – $350kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation calls for the complete replacement of Bridge #1 on Ledgewood Drive (Township Road 398) in Medina Township, Ohio. The work includes demolition of the existing corrugated‑metal‑pipe arch, installation of a new corrugated‑aluminum‑pipe arch culvert, full concrete footers and wingwalls, roadway reconstruction, fence removal/installation, utility relocation, and associated earthwork, drainage, and traffic‑control measures. The project is funded jointly by the Ohio Public Works Commission (OPWC) and Medina County, with an estimated overall cost of roughly $305 K. The contractor must provide a full bid guaranty (bond or 10 % cash/letter of credit), comply with Ohio prevailing‑wage rules, submit weekly certified payroll, and furnish the required performance and maintenance bonds. The construction window is limited to a November 1 2026 completion, with a maximum 60‑day road closure. • Demolition of existing bridge and removal of utility lines, followed by installation of an 11‑9″ × 7‑2″ corrugated aluminum pipe arch culvert. • Full concrete work (headwalls, footings, pavement, sidewalks) complying with ODOT specifications, plus seeding, mulching, and erosion‑control. • Traffic‑control, utility coordination, and compliance with Ohio ethics, EEO, and de‑barment certifications.

Attached files

Contact

Emry Hollopeter(Project Engineer)

(330) 723-9655

Key dates

Opened
6/24/2026
Questions due
7/6/2026
Closes
7/10/2026
Projected award
7/14/2026
Duration
110 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
47865

Budget estimate

$250,000 – $350,000

The solicitation’s engineer estimate is $304,750. Assuming a typical contractor gross profit margin of 8‑12 % for bridge‑replacement work, the expected revenue (contract award) would likely fall between $250 K and $350 K. The range reflects possible variations in subcontractor pricing, material cost fluctuations, and any change‑order adjustments.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Division of Highways·North Carolina

Top match · 77%

Replacement of Bridge 560098 (Purchase Order DM00407)

Closes 11/18/2026Opened 10/28/2026

Daviess County·Missouri

77% match

Daviess County: Bridge Replacement - Bridge No. 3960007; BRO-R031 (002); Forest Avenue

Closes 11/18/2026Opened 10/16/2026

Arkansas

76% match

bids - replace I-55 bridge

Rolling / TBD closeOpened 10/11/2026

Missouri Department of Transportation·Missouri

75% match

NW District, Daviess County, construction of a 97’-7 7/8” long, single span, W40x235 Steel I-Girder bridge at 20-degree L.A. skew and 3.5% grade, located on Forest Avenue

Closes 11/18/2026Opened 10/19/2026

Portage County·Ohio

75% match

Ravenna Rd Bridge Replacement Project-Bid

Rolling / TBD closeOpened 4/2/2026

City of Frontenac·Missouri

75% match

STP-5503(609) - Spoede Road Bridge Replacement

Closes 11/2/2026Opened 9/15/2026

Town of Pulaski·Virginia

75% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

City of Cedar Rapids·Iowa

75% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Carver County·Minnesota

75% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

Oregon Department of Transportation·Oregon

75% match

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

75% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

LA Public Works Engineering Bureau·California

75% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

Connecticut City of Meriden·Connecticut

75% match

Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

City of Cedar Rapids·Iowa

75% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

75% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

75% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Georgia City of Chattahoochee Hills·Georgia

75% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

City of Cedar Rapids·Iowa

75% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Massachusetts Department of Transportation·Massachusetts

74% match

609068 SHEFFIELD FAP No. STP(BR-OFF)-003S(993)X Bridge Replacement, S-10-015, Kelsey Road over Sch

Closes 11/10/2026Opened 9/8/2026

Roanoke City Government·Virginia

74% match

SOL1342, Wiley Drive Low Water Bridge Replacement

Closes 11/4/2026Opened 9/23/2026

Portage County·Ohio

74% match

Esworthy Rd Bridge Replacement Project-Bid

Rolling / TBD closeOpened 4/22/2026

CPPJ Road, Bridge, & Utility·Louisiana

74% match

West Parish Road Bridge Replacement Project

Closes 11/5/2026Opened 10/8/2026

City of Meriden·Connecticut

74% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

City of St. Louis Board of Public Service·Missouri

74% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

City of Philadelphia·Pennsylvania

74% match

PW Bid 3986ECMS (MPMS# 111515) Cherokee St. o/ Valley Green Rd.

Closes 12/3/2026Opened 10/30/2026