Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›SEK200387- INSTALLATION OF TIDE GATE CHAMBER ON 9’-6” X…

NYC Department of Design and Construction·New York

SEK200387- INSTALLATION OF TIDE GATE CHAMBER ON 9’-6” X 5’0” SEWER AT AVENUE K

Closes 6/4/2026$50k – $150kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of New York’s Department of Design and Construction is seeking qualified contractors to install a tide‑gate chamber measuring approximately 9‑½ feet by 5 feet within an existing sewer line on Avenue K. This project involves removal of existing pipe sections, placement of a prefabricated tide‑gate chamber, integration with existing storm‑water infrastructure, and restoration of the surrounding roadway and sidewalks. The work must comply with NYC construction standards, include required testing and inspections, and be completed within the schedule set by the solicitation. • Install a 9’‑6” × 5’0” tide‑gate chamber in the sewer at Avenue K. • Perform associated demolition, pipe removal, back‑filling, and surface restoration. • Provide all necessary materials, labor, permits, testing, and documentation required by DDC. • Ensure compliance with NYC Department of Design and Construction specifications and safety regulations. • Submit a sealed bid by the stated deadline (June 4, 2026, 11:00 AM).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Karen General

[email protected]

(718) 391-2410

Key dates

Opened
5/8/2026
Closes
6/4/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237210
Solicitation №
PIN#85026B0082

Budget estimate

$50,000 – $150,000

The installation of a custom tide‑gate chamber in an urban sewer typically involves design validation, specialized steel or concrete fabrication, demolition, installation, and surface restoration. For a project of this size (approximately 9.5 × 5 ft), total contract values in NYC range from $50 k for a straightforward install up to $150 k if extensive demolition, traffic control, and site restoration are required. Factors influencing the final amount include material costs, site access constraints, required traffic management, and any ancillary utility relocations.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Philadelphia·Pennsylvania

Top match · 73%

PW Bid 2730- TIDE GATES REPLACEMENT in DELAWARE AVE and PENN ST, REGULATING CHAMBER D-46

Closes 11/10/2026Opened 10/28/2026

City of Key West·Florida

72% match

CDBG-MIT – Trenchless Installation of Utilities Across Fleming Channel

Closes 12/2/2026Opened 10/15/2026

Maryland Baltimore County Government·Maryland

71% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

Hastings Utilities·Nebraska

71% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

Delaware County Regional Sewer District·Ohio

71% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

City of Pearland·Texas

70% match

Scarsdale Boulevard Sewer Extension

Closes 11/4/2026Opened 10/14/2026

City of Cincinnati·Ohio

70% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

James City County·Virginia

70% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026

Georgia Twiggs County Board of Commissioners·Georgia

70% match

Exit 24 - Sanitary Sewer System Extension (SEID Grant)

Closes 12/1/2026Opened 10/28/2026

Town of Oakland·Florida

70% match

Briley Avenue Septic-To-Sewer

Closes 11/19/2026Opened 10/15/2026

City of Braintree·Massachusetts

70% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

City of Hastings Public Works / Utilities·Nebraska

70% match

Lakeview 11th Water & SS Extension Dist 2026-1 HU 2026-77

Rolling / TBD closeOpened 7/21/2026

City of Whitehall·Ohio

69% match

Beechbank and Broadhurst Sewer Rehabilitation

Closes 11/13/2026Opened 10/28/2026

City of Cincinnati·Ohio

69% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

City of Lynchburg·Virginia

69% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

City of Ketchikan·Alaska

69% match

26-21 Water Street Sewer Improvements Phase B - Hopkins Alley to Front Street

Closes 11/20/2026Opened 10/30/2026

City of West Des Moines·Iowa

69% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

North Carolina Orange Water and Sewer Authority·North Carolina

69% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/27/2026

Town of Andrews·South Carolina

69% match

Cherry Street Sewer Upgrade

Closes 11/13/2026Opened 10/14/2026

U.S. Department Of Homeland Security·California

69% match

USCGC TERRELL HORNE – SEWAGE PIPING RENEWAL

Closes 11/11/2026Opened 10/28/2026

Washington Suburban Sanitary Commission, MD·Maryland

69% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·Indiana

69% match

Section 219 Chesterton Interceptor Rehab

Closes 10/15/2027Opened 10/15/2026

New York City Department of Design and Construction·New York

69% match

SE-885 - Trunk Sewer & Outfall at Bergen Basin for the 150th Street Trunk Sewer which shares an Outfall with the GUY R BREWER Trunk sewer

Closes 7/31/2030Opened 7/10/2026

Michigan Department of Health, Bureau of Engineering·Michigan

69% match

761/26157.JBB; Wells SP-Beach House Septic Sys Upgrades

Closes 11/12/2026Opened 10/22/2026

New York City Department of Environmental Protection·New York

69% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026