Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›Splash Pad Liner Replacement Clearfield and North Forest…

NYS Amherst, Town of·New York

Splash Pad Liner Replacement Clearfield and North Forest Parks

Closes 7/9/2026$100k – $500kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The work is to furnish all equipment, labor and materials to provide and install new PVC pool liner membrane system, RenoSys Endura Series PVC Pool membrane (or equal) as specified for the splash pads at Clearfield and North Forest Parks. Work will include preparing the existing concrete splash pads surface to accept new liner as per manufacture requirements. Installation of new liner membrane system and all accessory components, adhesives and underlayment membranes to provide a water tight permanent system. Refer to details for all construction requirements for perimeter connections and connections and or penetrations at any existing pool equipment, devices, or structures. Existing play aquatic equipment at Clearfield Park shall remain in place and liner shall be installed as per manufacture details. Contractor is responsible to obtain all building permits (all fees waived). All contractor work shall be as per the design details, manufacture installation requirements, and in accordance with the contract documents. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: NONE

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Hitzel(Architect)

[email protected]

(716) 631-7154 ext. 7069

Key dates

Opened
6/29/2026
Closes
7/9/2026
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
2026.020

Budget estimate

$100,000 – $500,000

The budget for this project can be estimated based on the scope of work, which includes the replacement of splash pad liners at two parks. The cost of materials, labor, and equipment will be significant. Assuming a moderate-sized splash pad, the cost of a new PVC pool liner membrane system could range from $50,000 to $200,000, depending on the size and complexity of the project. Additionally, the contractor will need to factor in the cost of labor, equipment, and permits. Therefore, a rough estimate for the total budget could be between $100,000 and $500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lauderhill·Florida

Top match · 68%

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026Opened 10/2/2026

City of Lauderhill·Florida

67% match

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026Opened 10/2/2026

City of Encinitas / San Dieguito Water·California

66% match

Park Equipment Replacement at Wiro and Orpheus Parks

Closes 11/12/2026Opened 10/15/2026

Arkansas

66% match

NW Park Tree Replacement

Rolling / TBD closeOpened 8/30/2026

Pierce County·Washington

65% match

Gonyea Playfield

Closes 11/18/2026Opened 10/16/2026

Gwinnett County Government·Georgia

65% match

Staining and Installation/Repair of Pavilions at Various Park Locations

Closes 11/4/2026Opened 10/26/2026

James City County·Virginia

65% match

Chickahominy Riverfront Park Pool

Closes 11/9/2026Opened 10/9/2026

Gwinnett County Government·Georgia

64% match

Staining and Installation/Repair of Pavilions at Various Park Locations

Closes 11/4/2026Opened 10/26/2026

City of Goose Creek·South Carolina

64% match

Creekside Park Renovations

Closes 11/30/2026Opened 10/30/2026

County of Stanislaus·California

64% match

Turlock Lake State Recreation Dock Replacement

Closes 11/12/2026Opened 10/21/2026

City of Dublin·Ohio

64% match

Ballantrae Park – Spray Ground Renovations

Closes 11/2/2026Opened 10/12/2026

Columbus Consolidated Government·Georgia

64% match

Tennis Court Resurfacing at Lakebottom Park and Double Churches Park

Closes 11/4/2026Opened 9/1/2026

City of Delphos·Kansas

64% match

A Place To Play - Park Improvements - Delphos, KS

Closes 11/2/2026Opened 9/28/2026

Boston Public Schools·Massachusetts

64% match

Playground Surface Replacement

Closes 11/12/2026Opened 10/28/2026

Gwinnett County Government·Georgia

64% match

Staining and Installation/Repair of Pavilions at Various Park Locations

Closes 11/4/2026Opened 10/26/2026

City of Newark·New Jersey

64% match

Green Parks Projects: NJ Regional Day School, Bo Porter Sports Complex, Mildred Helms Park, and Homestead Park

Closes 11/19/2026Opened 9/16/2025

City of Manchester·New Hampshire

64% match

Parks: Manchester Skate Park & Harvell St. Improvement

Closes 11/19/2026Opened 10/9/2026

Maryland National Capital Park and Planning Commission·Maryland

64% match

Design Build for New Glen Dale Splash Project

Closes 11/16/2026Opened 9/30/2026

City of Farmington·New Mexico

64% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

Pierce County·Washington

63% match

Orangegate Park Phase 1 Site Improvements

Closes 11/10/2026Opened 10/7/2026

City of Clearwater·Florida

63% match

Athletic Field Sod Material & Installation

Closes 11/20/2026Opened 10/21/2026

City of Greenacres·Florida

63% match

Parks Court Resurfacing

Closes 11/19/2026Opened 10/19/2026

Georgia Gwinnett County·Georgia

63% match

IWQ 139826 Staining and Installation/Repair of Pavilions at Various Park Locations

Closes 11/4/2026Opened 10/26/2026

Miami-Dade County·Florida

63% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Washington County, WI·Wisconsin

63% match

Glacier Hills Co Park Friess Lake Access Project

Closes 11/5/2026Opened 10/7/2026