The Navajo Nation Division of Transportation is seeking contractors to fully reconstruct an 11.43 km (7.1‑mile) roadway corridor from Cornfields to Burnside, Arizona. The work includes extensive earthwork, aggregate base placement, hot‑mix asphalt paving, drainage structures, culvert installation, removal and replacement of fences, gates, cattle‑guards, signage, and pavement markings, as well as erosion‑control measures and a field testing laboratory. The contract is a fixed‑price, firm‑price award with a 300‑working‑day performance period and requires compliance with FP‑14 federal specifications, Davis‑Bacon wage rates, and Navajo Preference Act requirements. Bids must be submitted in sealed envelopes by July 16 2026; a mandatory virtual pre‑proposal meeting was held on June 17 2026, and the question‑and‑answer window closed on June 30 2026.
• Full roadway reconstruction (grading, base, asphalt, drainage)
• Installation of multiple pipe culverts, end sections, and associated structures
• Removal/replacement of fencing, gates, cattle‑guards, signage, and pavement markings
• Required sub‑contracting plan favoring Navajo‑owned businesses, 10 % bid bond, performance/payment bonds, and 6 % Navajo sales tax