Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›26-48 CR 2321 Resurfacing - Phase 1 (SCOP)

Bay County, FL·Florida

26-48 CR 2321 Resurfacing - Phase 1 (SCOP)

Closes 6/30/2026$3M – $4MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bay County Board of County Commissioners is seeking bids from qualified contractors to resurface approximately 2.818 miles of CR 2321 from the Deer Point Lake Bridge to SR 75 (US 231), incorporating the addition of two new turn lanes within these project limits. The project will consist of earthwork operations, sheet pile installation, adjustments to existing headwalls, installation of guardrail, milling, paving, placement of pavement markings and signage, installation of cross drain pipes, and stabilization of all disturbed areas. The key aspects of this project include: • Resurfacing of approximately 2.818 miles of CR 2321 • Addition of two new turn lanes • Earthwork operations • Sheet pile installation • Adjustments to existing headwalls • Installation of guardrail • Milling and paving • Placement of pavement markings and signage • Installation of cross drain pipes • Stabilization of all disturbed areas The Prime Contractor shall be qualified in the following major classes of work: Flexible Paving, Hot Plant-Mixed Bituminous Courses, Drainage, and Grading.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Marc MacLean(Department Point of Contact)

[email protected]

(850) 248-8301

Key dates

Opened
5/27/2026
Questions due
6/19/2026
Closes
6/30/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
26-48

Budget estimate

$3,000,000 – $4,000,000

The estimated budget for this project is $3,358,630, which is 100% funded by FDOT. Based on this information, the budget for the contractor can be estimated to be around $3,358,630. However, this amount may vary depending on the actual cost of the project and the contractor's bid. The factors that may influence the likely payment range include the cost of materials, labor, and equipment, as well as any potential change orders or unforeseen expenses.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Lowndes County·Georgia

Top match · 69%

TIA-15: Resufacing Phase I

Closes 11/12/2026Opened 10/7/2026

Bay County·Florida

69% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

Mississippi

68% match

Construction of Railroad Rehabilitation Phase 1

Closes 11/2/2026Opened 10/30/2026

Bay County, FL·Florida

68% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

San Bernardino County·California

68% match

Muscoy Area Rehabilitation - Phase 1

Closes 12/3/2026Opened 10/27/2026

Jea·Florida

67% match

1412080446 (RFP) Brandy Branch Generating Station B52-B53 SCR Catalyst Replacement

Closes 12/16/2026Opened 11/22/2025

Georgia Lowndes County Board of Commissioners·Georgia

67% match

TIA-15: Resurfacing Phase I

Closes 11/12/2026Opened 10/7/2026

San Jacinto Community College District·Texas

67% match

CSP #27-04 Building N1 Roof and Envelope Repairs

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of Defense·North Dakota

67% match

48--HIGH STAGE PRECOOLE, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

The City of Columbus·Ohio

66% match

RFQ033889 - Police - Pool Resurfacing

Closes 11/19/2026Opened 10/17/2026

Jefferson County, AL - Department of Roads and Transportation·Alabama

66% match

Contract Resurfacing 2027 – Group 1

Closes 11/17/2026Opened 10/16/2026

U.S. Department Of Defense·Missouri

66% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Beaufort County, SC·South Carolina

66% match

Beaufort County 2027 Resurfacing

Closes 11/17/2026Opened 10/16/2026

Massachusetts Town of Westborough·Massachusetts

66% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Santa Rosa·California

66% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 11/10/2026Opened 9/29/2026

City of Rockford·Illinois

66% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

City of Chino·California

66% match

IB278, PF264, PF270 - MULTIPLE FACILITIES ROOF REPLACEMENT PROJECT

Closes 11/17/2026Opened 10/8/2026