Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Minnesota
  4. ›Construction
  5. ›Rosemount 154th Street Dump Environmental Remediation

University of Minnesota·Minnesota

Rosemount 154th Street Dump Environmental Remediation

Closes 10/7/2026$5M – $10MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of Minnesota seeks a qualified construction contractor to execute Phase 1 of the Rosemount 154th Street Dump Environmental Remediation project. The work involves excavating contaminated soils from the Gower Ordnance Works (GOW) Burning Grounds, installing storm‑water controls, transporting the soils to the 154th St. Dump site for temporary stockpiling, and completing site grading and revegetation—all while complying with asbestos handling requirements and prevailing‑wage regulations. The contract is a fixed‑price lump‑sum with a hard deadline for substantial completion by 18 December 2026. • Primary scope: excavation of contaminated soils (≈2 ft depth) at GOW site and temporary stockpiling at 154th St. Dump site. • Required services: storm‑water protection, site access/hauling routes, tree clearing, grading, topsoil placement, and asbestos management (license required). • Mandatory pre‑proposal meeting with site walk‑through on 24 Sept 2026 (attendance required). • Fixed‑price lump‑sum contract; submission deadline 5 Oct 2026, questions due 28 Sept 2026. • Project must be substantially complete by 18 Dec 2026; award anticipated early October 2026. • Contractor must meet Minnesota “Responsible Contractor” criteria and hold applicable licenses (e.g., asbestos contractor). • Evaluation weighted toward team qualifications (25 %), approach (35 %), schedule (10 %), cost (25 %), safety (5 %).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kevin Sullivan

[email protected]

Key dates

Opened
9/17/2026
Questions due
9/28/2026
Pre-bid meeting
9/24/2026Mandatory
Closes
10/7/2026
Duration
2 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
562910
Solicitation №
19-408-26-4109 Addendum 3

Budget estimate

$5,000,000 – $10,000,000

The RFP does not disclose the contract sum, but comparable university‑led soil‑remediation projects in the Upper Midwest typically range from $5 million to $10 million for Phase 1 excavation and temporary stockpiling of several thousand cubic yards of contaminated material, including storm‑water controls, permitting, and asbestos handling. Factors influencing the final amount include the volume of soil, disposal fees, asbestos mitigation costs, and prevailing‑wage labor rates. Therefore a reasonable estimate for the lump‑sum award is $5 M–$10 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Stockton·California

Top match · 68%

SOUTH POINTE ENVIRONMENTAL CLEANUP

Closes 11/19/2026Opened 10/22/2026

City of Tucson·Arizona

68% match

Environmental Services Clean City Support

Closes 11/6/2026Opened 10/9/2026

City of Des Moines·Iowa

67% match

Removal and Disposal of Junk, Debris and Environmentally Hazardous Materials

Closes 11/5/2026Opened 10/14/2026

City of Glendale·California

66% match

PROCESSING AND DIVERSION OF ORGANIC AND RECYCLING MATERIALS

Closes 11/10/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

66% match

ENVIRONMENTAL REMEDIATION SERVICES MULTIPLE AWARD TASK ORDER CONTRACT W912P9

Closes 11/12/2026Opened 10/28/2026

City of Hastings·Nebraska

66% match

E Street Resurfacing - Burlington Ave to Pine Ave CH 2026-57

Rolling / TBD closeOpened 9/18/2026

NYS Sleepy Hollow, Village of·New York

65% match

64-68 BEEKMAN AVENUE SITE CLEANUP PROJECT

Closes 11/23/2026Opened 10/23/2026

City of Toledo·Ohio

65% match

RACM Demolition Debris Disposal Site- REBID

Closes 11/10/2026Opened 10/23/2026

Washington Ecology, Department of·Washington

65% match

2024 Residential Cleanup Group

Closes 11/3/2026Opened 9/16/2026

Connecticut City of Norwich·Connecticut

65% match

Greeneville Fire House Mold Remediation

Closes 11/5/2026Opened 10/7/2026

City of Fresno·California

65% match

Abatement of Lead Based Paint at 5223 W Ashlan Ave & Demolish and Dispose of Structures at 5245 & 5223 W Ashlan Ave, Fresno CA 93722

Closes 11/3/2026Opened 10/2/2026

Toledo - Lucas County Port Authority·Ohio

65% match

Remedial Action for Lower Maumee River Sway Bridge within the Maumee Area of Concern

Closes 12/8/2026Opened 10/29/2026

Maryland Baltimore County Government·Maryland

65% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

City of Frostproof·Florida

65% match

Septic to Sewer - W 9th St

Closes 12/8/2026Opened 10/26/2026

State University of New York (SUNY)·New York

65% match

Refuse Removal

Closes 11/5/2026Opened 10/15/2026

City of Fresno·California

65% match

Demolish and Dispose of Structures and Site Improvements at 1585 N Blackstone Avenue

Closes 11/3/2026Opened 10/19/2026

Georgia City of Springfield·Georgia

65% match

RFP 26-004 Residential Solid Waste Collection and Disposal

Closes 11/3/2026Opened 9/29/2026