Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Civil Engineering
  5. ›Water Treatment Plant Lime Sludge Lagoon – Engineering…

City of Aurora, IL·Illinois

Water Treatment Plant Lime Sludge Lagoon – Engineering Consulting Services

Closes 8/26/2026$500k – $2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Aurora is seeking a qualified engineering consultant to provide design and construction engineering services for the modification of the Water Treatment Plant Lime Sludge Lagoon. The project involves the design and construction of a Portland Cement Concrete (PCC) lagoon to replace the existing clay-lined lagoons. The consultant will be responsible for providing all necessary services, including design, bidding, and construction engineering services. The project is expected to be completed in three phases, with the first phase starting in June 2027 and the final phase completing in 2029. The consultant will be required to provide a detailed scope of work, including a project schedule, budget, and staffing plan. • The consultant will be responsible for designing and constructing the PCC lagoon, including obtaining necessary permits and approvals. • The consultant will be required to provide construction engineering services, including site observation, testing, and inspection. • The consultant will be responsible for coordinating with the City and other stakeholders, including the Illinois Environmental Protection Agency (IEPA) and the Illinois Department of Transportation (IDOT). • The consultant will be required to provide a detailed project schedule and budget, including a breakdown of costs and a timeline for completion. • The consultant will be responsible for ensuring that all work is completed in accordance with City, IDOT, and IEPA standards.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

John Hoffmann(Purchasing Director)

[email protected]

(630) 256-3244

Key dates

Opened
8/4/2026
Questions due
8/12/2026
Closes
8/26/2026
Duration
3 years

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541330
Solicitation №
26-073

Budget estimate

$500,000 – $2,000,000

The budget for this project is estimated to be between $500,000 and $2,000,000, based on the scope of work and the requirements of the project. The consultant will be required to provide a detailed scope of work, including a project schedule, budget, and staffing plan, which will be used to determine the final budget. The budget will be based on a time and materials contract, with the consultant billing the City for actual costs incurred. The City has a budget for the project, but the exact amount is not specified. The budget will be influenced by factors such as the complexity of the design, the number of stakeholders involved, and the timeline for completion.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Hollywood·Florida

Top match · 74%

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Hollywood·Florida

73% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

73% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

Florida Keys Aqueduct Authority·Florida

73% match

Engineering services for Kermit H. Lewin 2.0 MGD Reverse Osmosis Water Treatment Plant

Closes 12/8/2026Opened 10/28/2026

Florida Keys Aqueduct Authority·Florida

72% match

Engineering services for Kermit H. Lewin 2.0 MGD Reverse Osmosis Water Treatment Plant

Closes 12/8/2026Opened 10/28/2026

City of Neptune Beach·Florida

72% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

City of Richland·Washington

72% match

Water Treatment Plant Filter Bay Valve Replacement

Closes 11/3/2026Opened 9/27/2026

Conway Corporation·Arkansas

72% match

Treatment Plant Sludge Removal

Closes 11/3/2026Opened 10/11/2026

City of Melbourne·Florida

72% match

Water and Sludge Analysis Services

Closes 11/3/2026Opened 10/2/2026

City of Bakersfield·California

72% match

RFQ - Consulting Services for Water Well CBK-81 Construction and L-211 TCP & H2S Treatment

Closes 11/3/2026Opened 10/13/2026

City of Bakersfield·California

72% match

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

Connecticut Town of Old Saybrook·Connecticut

71% match

Water Pollution Control Authority Environmental Studies

Closes 11/23/2026Opened 10/26/2026

City of Long Prairie·Minnesota

71% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

City of Austin·Texas

71% match

Davis Water Treatment Plant Filter System Improvements

Rolling / TBD closeOpened 10/2/2026

City of Hollywood·Florida

71% match

PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER TREATMENT PLANT PROGRAM MANAGEMENT (PROJECT NO. 26-1351)

Closes 11/10/2026Opened 10/6/2026

Sun 'n Lake Improvement District·Florida

71% match

Wastewater Treatment Plant Progressive Design-Build Services

Closes 11/20/2026Opened 10/19/2026

City of Hollywood·Florida

71% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

The Metropolitan Water District of Southern California·California

71% match

Solids Removal and Disposal Services for MWD Skinner Water Treatment Plant

Closes 11/19/2026Opened 10/15/2026

City of Hollywood·Florida

71% match

PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER DISTRIBUTION, TRANSMISSION & WASTEWATER COLLECTION PROGRAM MANAGEMENT (PROJECT NO. 26-1352)

Closes 11/17/2026Opened 10/13/2026

City of Ontario·California

71% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

City of Charlotte·North Carolina

71% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

Town of Lexington·South Carolina

70% match

Services for Potable Water System Hydraulic Modeling and Program Management

Closes 11/5/2026Opened 9/16/2026

Township of North Brunswick·New Jersey

70% match

Water/Wastewater Consulting Services

Closes 11/13/2026Opened 10/21/2026

Town of Jupiter Island·Florida

70% match

CONTINUING PROFESSIONAL ENGINEERING CONSULTING SERVICES

Closes 11/17/2026Opened 10/16/2026

City of Casper·Wyoming

70% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026