The U.S. Army Corps of Engineers, Vicksburg District, requires a contractor to provide all labor, tools, equipment, transportation, parts, materials, and other incidentals necessary for the removal of the components of the existing sewer grinder pump stations and the installation of new, fully operational duplex grinder pump station components at the Enid Lake Project. The contractor must provide a detailed and itemized quote with the specification sheet for each pump and all other products being offered. The project includes the removal and replacement of 11 sewer grinder pump stations. The contractor must also provide a two-year warranty on the work and newly installed components.
• The contractor must supply and install new fiberglass grinder pump basins, grinder pumps, discharge piping, and control panels.
• The contractor must perform all electrical and mechanical connections required to place the system into service.
• The contractor must test and commission the station to ensure proper operational status.
• The contractor must provide a plan of action to perform the installation of the grinder pumps in accordance with the statement of work.
• The contractor must provide documentation that clearly demonstrates their capability to provide and install the products as specified in the scope of work.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.