Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Minnesota
  4. ›Construction
  5. ›2026 Terminal 2 Roadway Additional Lane

Metropolitan Airports Commission·Minnesota

2026 Terminal 2 Roadway Additional Lane

Closes 4/16/2026$5M – $10MInvitation for BidLogin requiredFee to access
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This project adds a 1,050‑foot traffic lane on Humphrey Drive in front of Terminal 2 at Minneapolis‑St. Paul International Airport. The work includes demolition of existing planter walls, pavement, concrete curb and gutter, water mains, signs, and light poles, followed by construction of a new concrete roadway, storm‑sewer infrastructure, lighting foundations, landscaping, and associated utilities. • Demolition of existing roadway elements (planter walls, pavement, curb/gutter, watermain, signage, light poles). • Installation of 9‑inch concrete pavement, aggregate base, concrete sidewalks, curb & gutter, storm‑sewer pipe and drainage structures. • New light‑pole and flag‑pole foundations, irrigation modifications, traffic‑control devices, and landscaping. • All work to be performed on airport property with required coordination, permitting, and compliance with airport safety standards.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Zuleyka Marquez(Owner Representative)

[email protected]

(612) 467-0927

Key dates

Opened
4/3/2026
Pre-bid meeting
4/7/2026
Closes
4/16/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
Quest Number: 9936757

Budget estimate

$5,000,000 – $10,000,000

The contract will likely run into the multi‑million‑dollar range given the extensive demolition, new concrete pavement, utility relocations, and airport‑specific requirements. Comparable airport roadway expansions of similar length typically cost between $5 M and $10 M, so a reasonable estimate for the contractor’s earnings (including profit and overhead) would fall within that band.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lynchburg·Virginia

Top match · 68%

IFB 2027-029 TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

City of Lynchburg·Virginia

65% match

TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

Port of Tacoma·Washington

64% match

TOTE Terminal Pavement Maintenance and Repair (2026)

Closes 11/17/2026Opened 10/31/2026

Town of Medfield·Massachusetts

63% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

Macomb County Department of Roads·Michigan

63% match

2026 Traffic Signal Modernization Phase II – Macomb County Department of Roads

Closes 11/13/2026Opened 10/16/2026

Calhoun County Board of County Commissioners·Florida

62% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

Louisiana Capital Area Transit System·Louisiana

62% match

2222 Florida Terminal Improvement Project

Closes 12/7/2026Opened 10/22/2026

Illinois Tollway·Illinois

62% match

I-26-2059 - Plaza Improvements

Closes 11/13/2026Opened 10/3/2026

Illinois Tollway·Illinois

62% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Capital Area Transit System·Louisiana

62% match

2026-FloridaTerminal-003

Closes 12/7/2026Opened 10/22/2026

County of Okaloosa·Florida

62% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

Town of Medfield, Massachusetts·Massachusetts

62% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

Iowa City·Iowa

61% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

City of Shawnee·Kansas

61% match

Resolution No. 2056

Closes 4/22/2030Opened 4/22/2025

City of Shawnee·Kansas

61% match

Resolution No. 2061

Closes 8/6/2030Opened 5/6/2025

U.S. Department Of Transportation·Hawaii

61% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

City of Slidell·Louisiana

61% match

27-B009 Taxilane Mill and Overlay

Closes 11/10/2026Opened 10/7/2026

City of Lancaster·Texas

61% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

Port of Portland·Oregon

60% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

Illinois Tollway·Illinois

60% match

I-25-4767 - Roadway & Bridge Construction

Closes 11/20/2026Opened 10/3/2026

Georgia Decatur County Board of Commissioners·Georgia

60% match

Rehab Terminal Apron

Closes 11/5/2026Opened 10/5/2026

Municipality of Anchorage·Alaska

60% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

Minnesota Department of Transportation·Minnesota

60% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

City of Keene·New Hampshire

60% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

60% match

PUBLIC NOTICE: 2024–2027 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) AMENDMENT NO. 6 APPROVED

Rolling / TBD closeOpened 9/22/2026