Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Hawaii guideHawaii Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Hawaii
  4. ›Environmental Services
  5. ›Central Maui Landfill Phase II, Stage 6 Parts 2A and 2B…

County of Maui·Hawaii

Central Maui Landfill Phase II, Stage 6 Parts 2A and 2B and 7 Slope Improvements

Closes 7/9/2026$500k – $2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Maui is seeking bids for the Central Maui Landfill Phase II, Stage 6 Parts 2A and 2B and 7 Slope Improvements project. The project involves slope improvements, including track walk vegetation, supply and placement of gravel and protective soil layers, construction of anchor berms, and installation of landfill gas collection piping. The project requires significant familiarity with existing site conditions, and bidders are strongly encouraged to attend a non-mandatory pre-bid meeting and site visit. • The project includes primary work tasks such as track walk vegetation, supply and placement of gravel and protective soil layers, construction of anchor berms, and installation of landfill gas collection piping. • The project requires compliance with erosion control measures, including the use of fiber rolls and sandbag barriers. • Bidders must submit a proposal, including a bid bond, and must comply with all applicable laws and regulations. • The project is expected to be completed within a few months, although the exact duration is not specified.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kris Arisumi(Bid Contact)

[email protected]

(808) 270-7488

Key dates

Opened
5/29/2026
Pre-bid meeting
6/17/2026
Closes
7/9/2026

Last updated

Details

Type
Invitation for Bid
Industry
Environmental Services
NAICS
562910
Solicitation №
IFB 25-26/P-170

Budget estimate

$500,000 – $2,000,000

The budget for this project is estimated to be in the range of $500,000 to $2,000,000. This estimate is based on the scope of work, which includes slope improvements, landfill gas collection piping installation, and erosion control measures. The project requires significant materials and labor, which will drive up the costs. However, without more detailed information on the project's specifics, it is difficult to provide a more precise estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Maui·Hawaii

Top match · 80%

Central Maui Landfill Phase VII Part 1 BMPs and Regrade

Closes 11/12/2026Opened 10/22/2026

County of Maui·Hawaii

78% match

Central Maui Landfill Phase VII Part 1 Ash Disposal Cell Encapsulation Cap, BMPs

Closes 11/13/2026Opened 10/23/2026

County of Kauai·Hawaii

72% match

BMP Improvements at the Refuse Transfer Stations Phase II

Closes 11/2/2026Opened 10/1/2026

San Bernardino County·California

70% match

Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill

Closes 11/12/2026Opened 10/27/2026

County of Maui·Hawaii

69% match

Kihei 4 and 5 WWPS Modifications

Closes 11/2/2026Opened 10/2/2026

Miami-Dade County·Florida

69% match

South Dade Landfill - Cell 5 Side Slopes Stormwater Drainage Improvements

Closes 11/12/2026Opened 10/6/2026

Delaware Solid Waste Authority·Delaware

68% match

CHERRY ISLAND LANDFILL (CIL) AND PIGEON POINT LANDFILL (PPLF) MANHOLE REHABILITATION – PHASE 2

Closes 12/15/2026Opened 10/28/2026

County of Maui·Hawaii

68% match

Upper Waiko Road Sewer Extension and Waikapu Waterline Project

Closes 11/2/2026Opened 10/6/2026

County of Maui·Hawaii

68% match

Labor and Materials for Renovation of Lalo Street Baseyard

Closes 11/2/2026Opened 10/5/2026

County of Maui·Hawaii

68% match

Kahului Fire Station Improvements for Additional Parking

Closes 11/5/2026Opened 10/2/2026

County of Maui·Hawaii

68% match

On-Call Litter Collection Services

Closes 12/3/2026Opened 10/30/2026

Greenville County·South Carolina

68% match

CLASS 2 LANDFILL PARTIAL CLOSURE

Closes 11/16/2026Opened 10/23/2026

County of Maui·Hawaii

68% match

Kaiola Place Sewer Extension

Closes 11/5/2026Opened 10/5/2026

County of Maui·Hawaii

68% match

Olowalu Kona Low Repair

Closes 11/13/2026Opened 10/21/2026

County of Madera - Public Works Department·California

67% match

Leachate Surface Impoundment / Ancillary Site Improvement and Cell 3 Liner Expansion at Fairmead Landfill

Closes 11/18/2026Opened 10/13/2026

County of Maui·Hawaii

67% match

Waikapu Road Subdivision Sewer System

Closes 11/5/2026Opened 10/5/2026

Greenville County·South Carolina

67% match

Class 2 Landfill Partial Closure

Closes 11/16/2026Opened 10/23/2026

County of Maui·Hawaii

67% match

Groundwater Deep Monitoring Well at Alaeloa Tank Site [Tk104]

Closes 11/13/2026Opened 10/5/2026

County of Volusia·Florida

67% match

Tomoka Landfill Roadway Improvement and Scale Addition

Closes 12/16/2026Opened 10/21/2026

Calhoun County Board of County Commissioners·Florida

67% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

County of Maui·Hawaii

66% match

Furnishing of Pavement Preservation Products

Closes 11/10/2026Opened 10/22/2026

County of Maui·Hawaii

66% match

Labor and Materials for Wailuku Baseyard Garage Repair

Closes 11/10/2026Opened 10/22/2026

County of Sacramento·California

66% match

Kiefer Landfill- Module 5, Phase 1 Liner Construction

Closes 11/5/2026Opened 8/31/2026

Miami-Dade County Department of Solid Waste Management·Florida

66% match

South Dade Landfill - Cell 5 Side Slopes Stormwater Drainage Improvements

Closes 11/12/2026Opened 10/6/2026

State of Hawaii Department of Transportation – Airports·Hawaii

66% match

CM1530-33 Apron Reconstruction, Phase 1, Kahului airport

Closes 11/16/2026Opened 10/2/2026