The Fermi National Accelerator Laboratory (Fermilab) is seeking a proposal for the procurement, fabrication, and delivery of a fall protection system for the cryostat structure. The system consists of three main subassemblies: a ladder-mounted vertical fall arrest system, a steel cable guardrail system, and a corner guardrail system. The subcontractor is responsible for procuring materials, fabricating, assembling, testing, packaging, and delivering the complete products. The system must conform to OSHA standards for fall protection and meet the requirements specified in the procurement specification.
• The fall protection system is designed to provide safe access to the exterior of the cryostat structure.
• The system consists of a ladder-mounted vertical fall arrest system, a steel cable guardrail system, and a corner guardrail system.
• The subcontractor is responsible for procuring materials, fabricating, assembling, testing, packaging, and delivering the complete products.
• The system must conform to OSHA standards for fall protection and meet the requirements specified in the procurement specification.
• The subcontractor must provide documentation certifying that the material is as specified and provide written inspection reports, including as-built drawings and results of tests.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.