Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Water and Wastewater
  5. ›Citywide Catch Basin Connecter Pipe Screen (CPS)…

City of Azusa·California

Citywide Catch Basin Connecter Pipe Screen (CPS) Installation Project

Closes 9/10/2026$100k – $250kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Azusa is seeking a qualified contractor to install Catch Basin Connector Pipe Screens (CPS) throughout the city. The contractor must supply all labor, materials, equipment, and incidentals to install the CPS devices, perform pre‑installation cleaning, and retrofit county‑owned catch basins in compliance with LACFCD standards. The scope includes confined‑space safety programs, coordination with transit agencies, and provision of Builder’s Risk Insurance. Bidders must submit a sealed bid by the deadline, include a 10 % bid bond, and be prepared to post prevailing wages and hold required licenses and certifications. • Install CPS devices city‑wide, including cleaning and retrofitting of existing catch basins. • Must maintain a confined‑space safety program, provide Builder’s Risk Insurance, and comply with CARB and prevailing‑wage requirements. • Bid submission requires a 10 % bid security, performance and payment bonds (100 % of contract price), and proof of Class A or C‑42 licensing, DIR registration, and CARB CRC for all subcontractors.

Attached files

Contact

Vidal Villagomez Jr.(Primary Contact for Questions)

[email protected]

Key dates

Opened
10/2/2026
Questions due
8/31/2026
Closes
9/10/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237210
Solicitation №
NIB81926

Budget estimate

$100,000 – $250,000

The engineer’s estimate for the full scope is $700,000, which represents the city’s anticipated cost. Assuming a typical contractor markup of 15‑25 % on construction projects of this nature, the contractor’s net earnings could range from roughly $105,000 to $175,000. Additional revenue may be generated from ancillary items (e.g., staging, waste handling) captured in bid items 3 & 4, potentially raising the upper bound toward $250,000. Therefore, a reasonable budget estimate is $100k‑$250k, depending on cost control, material pricing, and efficiency.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of San Bernardino·California

Top match · 79%

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

Town of Westwood·Massachusetts

67% match

Catch Basin Cleaning

Rolling / TBD closeOpened 9/9/2026

Connecticut Dept. of Correction·Connecticut

66% match

INSTALLATION OF IMPRESSED CURRENT CP SYSTEM

Closes 11/4/2026Opened 10/21/2026

City of Cincinnati - Purchasing Division·Ohio

66% match

Sycamore & Polk Run CCTV Camera Install for MSD

Closes 11/10/2026Opened 10/22/2026

Connecticut Dept. of Correction·Connecticut

66% match

INSTALLATION OF IMPRESSED CURRENT CP SYSTEM

Closes 11/4/2026Opened 10/21/2026

City of Rancho Palos Verdes·California

65% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

West County Wastewater·California

65% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Charlotte·North Carolina

65% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Cincinnati·Ohio

65% match

Sycamore & Polk Run CCTV Camera Install for MSD

Closes 11/10/2026Opened 2/1/2025

City of Ann Arbor·Michigan

64% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

California Department of Transportation·California

64% match

Construct DPP infiltration areas, capture housing, bioswales, & MVPs.

Closes 11/10/2026Opened 9/28/2026

City of Columbus Ohio·Ohio

64% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

Riverton City·Utah

64% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

City of Cincinnati·Ohio

64% match

Sycamore & Polk Run CCTV Camera Install for MSD

Closes 11/10/2026Opened 10/20/2026

New York City Department of Environmental Protection·New York

64% match

82626B0065-BEDC - CSO-GC-SFS-OH-CP3 Construction of CSO Facilities for Gowanus Canal

Closes 11/17/2026Opened 9/30/2026

City of Cincinnati Office of Procurement·Ohio

64% match

Sycamore & Polk Run CCTV Camera Install for MSD

Closes 11/10/2026Opened 10/28/2026

City of Redlands·California

64% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Charlotte·North Carolina

64% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

Unified Government of Wyandotte County and Kansas City, KS·Kansas

64% match

Manhole Covers, Frames & Catch Basin Inlet Grates & Frames for Environmental Services

Closes 11/18/2026Opened 10/22/2026

City of Bellevue·Washington

64% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

City of Cleveland·Ohio

64% match

542 - Windbreak Screen for Loading Dock

Closes 11/5/2026Opened 10/30/2025

The City of Columbus·Ohio

64% match

RFQ033812 - PAWP Wellfield Development

Closes 11/4/2026Opened 10/7/2026

City Utilities·Indiana

63% match

77635 - 2026 CIPP Pkg 1 Small and Medium Diameter

Closes 11/5/2026Opened 10/16/2026

Saline County·Kansas

63% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

New York City Department of Environmental Protection·New York

63% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026