The Town of Uxbridge is seeking bids for the Linwood Street and Church Street Drainage Improvements project. The project involves the removal of 18 drainage structures, installation of 14 drain manholes and 16 catch basins, removal of RCP drainage, and installation of approximately 300 feet of 12IN HDPE pipe, 360 feet of 15IN HDPE pipe, 25 feet of 18IN HDPE pipe, 450 feet of 24IN HDPE pipe, and 840 feet of 30IN HDPE pipe, along with other related civil/site work including modifications to two existing retaining walls to allow for installation of new drainage.
• The project requires the removal of existing drainage structures and installation of new ones.
• The project involves the installation of HDPE pipes of various sizes.
• The project requires modifications to existing retaining walls.
• The project is located in Uxbridge, Massachusetts.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.