The Georgia State Financing and Investment Commission (GSFIC), on behalf of the Technical College System of Georgia, is seeking qualified construction management‑at‑risk (CM/GC) firms to oversee the design‑build of a second instructional building (approximately 45,500 sf) at Gwinnett Technical College’s North Fulton Campus in Alpharetta, GA. The project will support expanded health‑care, welding, and HVAC programs and may be delivered as a single building or two purpose‑built structures. The CM/GC will be responsible for pre‑construction services, cost estimating, scheduling, subcontractor coordination, quality control, and commissioning under a construction‑manager‑at‑risk delivery method. The anticipated construction cost is $28.7 M with a 15‑month construction schedule. The procurement process consists of a two‑step qualification and fee‑proposal phase, with a deadline for qualifications on 11‑04‑2026 and fee proposals on 11‑19‑2026.
• Scope: Full CM/GC services for a 45,500 sf (plus possible 8‑12 k sf) educational facility expansion.
• Delivery method: Construction Manager at Risk (CM/GC) with required design professional and commissioning agent.
• Budget: $28.7 M construction cost limitation.
• Schedule: Design services start Nov 2026; construction documents by Sep 2027; 15‑month build period.
• Mandatory site visit for finalists: 12 Nov 2026.
• Minimum qualifications include GA general contractor license, bonding capacity, $1 M/2 M insurance limits, EMR ≤ 1.2, and $1 M+ cash‑flow ratio.
• Evaluation based on stability, experience, suitability, fee proposal, and interview performance.