The project involves repairing the drainline and repaving at the Durango SFU. The contractor will be responsible for locating existing utilities, digging a trench, removing and disposing of existing storm infrastructure, installing a new PVC to HDPE adapter, bend, and slotted drain pipe system, and installing new asphalt. The project is expected to start in August 2026 and be completed by the end of September. The contractor must ensure that construction does not negatively impact hatchery operations.
Key aspects of the project include:
• Utility location services
• Trenching and excavation
• Removal and disposal of existing storm infrastructure
• Installation of new drain pipe system
• Installation of new asphalt
• Coordination with hatchery operations